Jen and Barry are convinced the market survey results tell them to go into the "fresh salad bag" business. They analyze labor cost per production...

 Jen and Barry are convinced the market survey results tell them to go into the "fresh salad bag" business. They analyze labor cost per production shift. Two tasks are required for each shift: salad sorter and salad washer. Assembling salad bags requires 12 labor-hours by salad sorters and 24 labor-hours by salad washers. Packing salad bags requires 18 labor-hours by sorters and 3 labor-hours by washers. Minimum labor-hours needed per shift is 144 for assembling and 51 for packing. Cost per labor-hour is $18 for sorters and $22 for washers. Let x represent number of sorters hired per shift and y represent number of washers hired per shift.

Identify the labor-hour constraint for assembling salad bags:

A. 18