QUESTION

Keenes Systems allocates manufacturing overhead based on machine hours. Each connector should require 10 machine hours. According to the static...

Systems allocates manufacturing overhead based on machine hours. Each connector should require machine hours. According to the static​ budget, expected to incur the​ following: machine hours per month ​(connectors x machine hours per​ connector) in variable manufacturing overhead costs

in fixed manufacturing overhead costs

During​ August, actually used machine hours to make connectors and spent in variable manufacturing costs and in fixed manufacturing overhead costs.

Calculate the variable overhead efficiency variance for

A.

B.

C.

D.

PLEASE SHOW WORK!