Waiting for answer This question has not been answered yet. You can hire a professional tutor to get the answer.

QUESTION

Lot Sizing MRP Using Space Age Furniture's Master Schedule and their policy of producing sub-assemblies in lots of 1000, a Materials Required...

Lot Sizing MRP

           Using Space Age Furniture’s Master Schedule and their policy of producing sub-assemblies in lots of 1000, a Materials Required Planning (MRP) system can be developed. Production processes can create XXX (Vonderembse & White, 2013).  Breaking down the MRP into Levels sees the Master Schedule as XXX. The sub-assembly MRPs in Level 1 are organized using a lot sizing method due to Space Age’s policy of 1000 sized lots on orders. Further, the Level 1 MRPs are separated by the 435 sub-assembly and the 257 sub-assembly but both funnel into the gross requirements for Level 2.  

Show more
LEARN MORE EFFECTIVELY AND GET BETTER GRADES!
Ask a Question