Waiting for answer This question has not been answered yet. You can hire a professional tutor to get the answer.

QUESTION

Need an research paper on reliability-centered maintenance of a daiken split air conditioning system. Needs to be 11 pages. Please no plagiarism.

Need an research paper on reliability-centered maintenance of a daiken split air conditioning system. Needs to be 11 pages. Please no plagiarism. RCM covers both the risk of physical and operational failure and considers events that could reasonably cause an asset to cease performing any of its desired functions (Mutual Consultants Ltd 2009).

Proper maintenance of assets while important for both households and businesses is fundamental to the operating efficiency of businesses. The failure of a critical asset can have devastating consequences for a business if it cannot be repaired or replaced quickly. In order to ensure that adequate maintenance takes place a maintenance program needs to be implemented for all equipment in use. This program should be capable of predicting the degradation or failure of equipment before it happens. An RCM program can lead to increased operating performance, reduced maintenance costs, and reduced energy bills (Chimack et al n.d.).

‘RCM is a maintenance perspective in an operational context’ and so understanding the goals and needs of the organization is fundamental in the development of a maintenance strategy to optimize business outcomes in the context of the goals of the business (August 1999). The asset that is being analyzed is a Daiken split air conditioning system which is located in an office of 54 square metres. It provides cool air at a temperature differential (TD) of between 8 and 11oC and as a secondary function helps to eliminate or reduce unwanted particulate or gaseous substances from the air being supplied to the office. The office operates six (6) days per week at an average of seven (7) hours per day providing customer service to internet users and students doing research. On average about five to seven customers are being served at any one time and approximately 36 in any one day. The air conditioner is switched on and off using a remote control when the temperature gets too cold. The room temperature normally gets cold when only one or two customers are in the office.

Show more
LEARN MORE EFFECTIVELY AND GET BETTER GRADES!
Ask a Question