Answered You can buy a ready-made answer or pick a professional tutor to order an original one.

QUESTION

OPS 571 Week 2 Quiz / OPS 571 Week 2 Quiz (Score 100%)

1. In the pull system, which of the following is the partner that begins the process of pulling?

Vendors

Quality control personnel

Customers

Executive management

2. Which of the following operations consulting tools are used in the cost impact and payoff analysis stage in the operations consulting process?

SPC tools and bottleneck analysis

Customer surveys and gap analysis

Decision trees and stakeholder analysis

Plant audits and statistical tools

3. Which of the following production process terms best describes a stage in a multiple stage process that limits the capacity of the overall process?

Buffer

Starving

Bottleneck

Blocking

4. Which of the following is a principle of reengineering?

Organize around the tasks

Capture information many times, at the source and where it is interpreted

Treat geographically dispersed resources as though they were centralized

Integrate the outcomes of parallel activities

5. Which of the following operations consulting tools provide summary performance updates for specific processes and are generally presented in graphical form with color coding of trend lines and alarms?

Decision trees

Stakeholder analysis

Process dashboards

Responsibility charts

6. Which of the following are possible examples of cycle times?

Time that a part waits in queue

Time it takes for an instructor to grade an exam

Time required to produce a batch of parts

Time to set up a new assembly line

7. What is the term that refers to “the fundamental rethinking and radical redesign of business processes to achieve dramatic improvements in critical, contemporary measures of performance, such as cost, quality, service, and speed” (as cited in Jacobs & Chase, 2011, p. 461).

Reengineering

TQM

Operations consulting process

Continuous improvement

8. Which of the following is a key metric associated with value stream mapping?

Defects per million operations

Lead time

Product demand

Fixed costs

9. Which of the following is one of the major types of stakeholders impacted by most consulting projects?

Board of directors

International government regulators

Suppliers

Other consultants

10. Lean production seeks to achieve high volume production using which of the following?

Minimize utilization

Minimize inventory of raw materials

Maximize inventory of working process

Maximize capacity

11. In contrast to TQM, what approach seeks radical change through innovation?

JIT distribution

Project management

Reengineering

Lean manufacturing

12. In setting up a kanban control system, you need to determine the number of kanban card sets needed. If the average number of units demanded is 1,000 per hour, the lead time to replenish the order for this item is 10 hours, the container size is 5 units, and the safety stock is estimated to be 5% of the expected demand, what is the number of kanban card sets needed?

210

440

1,050

2,100

The number of kanban card sets is the (Demand Average) x ( Lead Time) x (1 +Safety Stock as decimal) / (Container Size). 

Substituting values, (1,000 per hour x 10 hours) x(1 + .05) / 5 = 2,100 card sets

13. Which of the following is a situation that likely will yield economies of scale?

Large factory with dedicated capacity that is able to produce twice the number of units as locally demanded

Factory that fully utilizes dedicated resources for information technology, material handling, and administrative support

Company with factories in multiple countries that produces products for local demand

Factory that produces low volume, customized products

14. The basic notion of economies of scale assumes which of the following?

A piece of equipment with twice the capacity of another piece typically costs twice as much to purchase and to operate

Total cost of output drops as volume increases

Average cost per unit of output drops as a plant gets larger and volume increases

Two plants can be operated at the same cost as a single plant

15. To implement a flow process in developing a lean system, a firm might do which of the following?

Reduce setup/changeover time

Eliminate some fixed costs

Improve capacity utilization

Build product in anticipation of demand

16. An advantage of a make to stock process is which of the following?

All units of output are unique

Rapid delivery of a standard product

It responds directly to customer orders

It allows the firm to avoid inventory costs

17. According to Little’s law, which of the following can be used to estimate inventory?

Set up time times throughput rate

Process velocity times flow time

Process time times cycle time

Throughput rate times flow time

18. Which of the following is a factor that causes a diseconomy of scale?

Increased utilization

Increased transportation costs

Increased total operating costs

Increased product value and prices

19. If the run time for a batch of parts is 25 minutes on a machine, and the setup time is 75 minutes, which of the following is the operation time?

3 minutes

25 minutes

100 minutes

75 minutes

The operation time is the sum of the setup time and run time for a batch of parts, or 25minutes + 75 minutes = 100 minutes

20. Which of the following production process terms best describes the situation when activities in a stage of production must stop because there is no work?

Multiple stage processing

Starving

Blocking

Buffering

21. Which of the following terms refers to a special type of flowcharting tool that is valuable for the development of lean processes?

Kanban production control system

JIT production

Value stream mapping

Kaizen

Show more
  • @
  • 177 orders completed
ANSWER

Tutor has posted answer for $14.00. See answer's preview

$14.00

* In *** **** system ***** of *** ********* is *** ******* **** ****** *** ******* ** *********

********

******* control **********

**********

Executive management

* Which ** *** ********* ********** ********** tools *** **** ** the **** ****** *** ****** ******** ***** ** *** ********** ********** process?

*** tools and bottleneck *********

******** ******* *** *** *********

******** trees and *********** *********

***** ****** *** *********** tools

* Which ** *** following ********** ******* ***** **** describes * ***** ** * ******** ***** ******* **** ****** *** capacity ** *** overall process?

*******

*********

***********

*********

* Which of *** ********* is * principle ** ***************

******** ****** the ******

Capture information many ***** ** *** ****** *** ***** ** is ************

***** geographically ********* ********* ** though they were ************

Integrate *** outcomes of ******** activities

* Which ** *** ********* ********** ********** ***** provide ******* *********** ******* for ******** ********* and *** ********* ********* in ********* **** **** ***** ****** ** ***** ***** *** ********

Decision ******

Stakeholder *********

******* ***********

Responsibility *******

* ***** ** *** following *** possible ******** ** ***** *******

**** that * **** ***** ** ******

Time ** takes for an instructor ** ***** ** exam

**** ******** ** ******* * ***** of parts

**** ** *** up * *** ******** *****

* What ** *** **** **** refers ** “the *********** rethinking *** ******* ******** of ******** ********* ** ******* dramatic ************ ** ******** contemporary ******** of performance **** as **** ******* ******* and ************ *** ***** ** Jacobs & Chase **** * *****

Reengineering

TQM

Operations consulting ********

Continuous improvement

8 Which ** *** ********* ** * *** ****** ********** with ***** ****** *********

******* *** million ***********

Lead time

******* *******

Fixed ******

* Which of *** ********* is *** ** the ***** ***** ** stakeholders ******** ** most consulting **********

***** of **********

************* ********** ***********

**********

***** consultants

10 **** ********** seeks to ******* high volume ********** using ***** of the following?

******** ************

******** inventory ** raw materials

Maximize inventory ** ******* process

******** *********

** ** ******** ** *** **** ******** ***** radical ****** ******* ************

*** *************

******* ***********

**************

**** **************

** ** setting ** a ****** ******* ****** *** **** ** ********* the number of ****** card **** needed ** *** average ****** of ***** ******** ** **** *** hour the **** **** ** ********* the order for this item is ** ***** *** ********* **** ** 5 ***** *** the ****** stock ** ********* ** ** ** of *** expected ****** what ** *** number ** kanban **** **** ********

****

****

1050

*****

*** ****** of ****** **** sets ** the ******* ******** * * **** ***** * (1 ******* ***** ** ******** / (Container Size)

************ ****** ***** *** hour x ** ****** *** * *** * * * **** **** *****

13 ***** ** *** ********* ** * situation **** ****** **** ***** economies ** *******

***** factory with ********* ******** **** ** able ** ******* ***** *** ****** ** units as ******* demanded

******* that fully utilizes dedicated ********* *** *********** ********** ******** ******** *** ************** ********

******* with factories ** multiple countries **** produces products for local demand

******* **** produces *** volume ********** products

** *** ***** notion ** ********* ** ***** ******* ***** ** *** ***********

* ***** of ********* **** ***** *** ******** ** ******* piece ********* costs ***** ** **** ** ******** *** ** ********

***** **** ** ****** drops as ****** **********

Average **** *** **** of output drops ** a ***** **** ****** *** ****** increases

*** ****** *** ** ******** ** *** **** **** ** * single ******

** ** ********* * flow ******* in developing * **** system * firm might ** ***** ** *** following?

****** **************** time

Eliminate **** ***** costs

******* ******** ************

***** product in ************ ** *******

** An ********* ** * make to ***** ******* is which ** *** ***********

*** ***** of ****** *** *******

***** delivery ** a standard ********

** responds ******** to ******** *******

** ****** *** **** ** ***** inventory costs

** ********* ** ************** *** ***** ** *** ********* can ** used ** ******** ***********

Set ** time times ********** rate

******* velocity ***** flow time

******* **** ***** ***** *****

Throughput **** ***** **** *****

18 ***** ** the following ** * ****** **** ****** * ********** of *******

********* ************

********* transportation ******

Increased ***** ********* ******

********* ******* value *** *******

** ** *** *** **** *** * ***** ** ***** ** 25 minutes ** * machine *** *** setup time ** 75 minutes which ** the ********* ** *** operation ******

3 ********

** ********

*** ********

** ********

*** ********* **** is the *** ** the setup **** *** run **** for a ***** ** ***** ** 25minutes * 75 minutes * 100 minutes

** Which ** *** ********* ********** ******* ***** **** ********* *** situation **** ********** ** * ***** of ********** **** **** ******* ***** ** no ******

******** stage ***********

*********

Blocking

**********

21 ***** ** the ********* ***** refers to a ******* type ** ************ **** **** ** valuable *** *** development ** **** ***********

Kanban ********** control *******

*** ***********

Value ****** ********

******

Click here to download attached files: OPS 571 Week 2 Quiz -.docx
or Buy custom answer
LEARN MORE EFFECTIVELY AND GET BETTER GRADES!
Ask a Question