Answered You can buy a ready-made answer or pick a professional tutor to order an original one.
Option #1: Create a Work Breakdown Structure (WBS)—EssayBased on the course readings and your research, write an essay that addresses the following key elements:Project scopeIn your own words, with
Option #1: Create a Work Breakdown Structure (WBS)—Essay
Based on the course readings and your research, write an essay that addresses the following key elements:
- Project scope
- In your own words, with cited support from scholarly resources, clearly and concisely define the construct of a project Scope Statement.
- Explain the use of a common technique to develop a project scope.
- Describe the practice for achieving project scope consensus.
- Project work breakdown structure (WBS)
- In your own words, with cited support from scholarly resources, clearly and concisely define the construct of a project work breakdown structure (WBS)
Additional InstructionsProperly organize your writing by including the following:
- Cover page
- Introduction
- Body of your work in response to the assignment’s key elements, with headings and subheadings
- Conclusion
- List of references
- Appendix (WBS).
The introduction through conclusion sections of your essay should be approximately 4-5 pages in length. Support your assignment with a minimum of three scholarly references. The CSU-Global library is a good place to locate these sources, and the Project Management Resources Guide (Links to an external site.)Links to an external site. is a great place to start. The written section should follow the CSU-Global Guide to Writing and APA (Links to an external site.)Links to an external site.standards. Consult the Sample Paper (Links to an external site.)Links to an external site. template for more information on how to organize the paper and review the rubric for specific grading criteria.
- @
- 587 orders completed
- ANSWER
-
Tutor has posted answer for $40.00. See answer's preview
*** ********
