QUESTION

PJM 350 Final

This may be a long shot but I am in need of help. Please let me know what is needed to get any assistance with this. This utilized a program called Primivera 6, I'm not sure if anyone has access to this. I have a link I was given to download but I am unsure if anyone is able to use it outside of my school, please let me know. 

Option #2: Construction Planning & Scheduling 

Portfolio Project Option #2 is to utilize Primavera P6 to develop a project schedule. Choose from the project plans supplied by the professor or pick one of your own. The project must be related to commercial buildings; it must also show a list of 30 different tasks and subtasks. 

Step 1: Choose a topic

  • Select the project you would like to work on. (I have selected a project of city center office building addition)
  • Ensure that you have more than 30 tasks.
  • Begin to familiarize yourself with the program.
  • Develop an outline of your project.
  • Develop tasks sequences

Step 2: Choose a topic

  • Develop tasks sequences
  • Develop tasks durations
  • Develop activities (tasks) in Primavera
  • Create a schedule

Step 3: Discussion and Conclusion:

  • Create relations between activities (tasks)
  • Calculate the critical path
  • Prepare a presentation to explain what you accomplished and learned from this project.

NOTE:

  • Your references should include at least 5 peer-reviewed articles.
  • Be sure to use the CSU-Global Library.
  • Remember to list your references according to the CSU Global Guide to Writing and APA or Purdue’s OWL.
  • Your paper needs to be in a format that includes an abstract, introduction, literature, main body and conclusion.
  • The final report needs to be 6-8 pages, which include your abstract (double-spaced, 12 point, Times New Roman)