PJM 350 Final
This may be a long shot but I am in need of help. Please let me know what is needed to get any assistance with this. This utilized a program called Primivera 6, I'm not sure if anyone has access to this. I have a link I was given to download but I am unsure if anyone is able to use it outside of my school, please let me know.
Option #2: Construction Planning & Scheduling
Portfolio Project Option #2 is to utilize Primavera P6 to develop a project schedule. Choose from the project plans supplied by the professor or pick one of your own. The project must be related to commercial buildings; it must also show a list of 30 different tasks and subtasks.
Step 1: Choose a topic
- Select the project you would like to work on. (I have selected a project of city center office building addition)
- Ensure that you have more than 30 tasks.
- Begin to familiarize yourself with the program.
- Develop an outline of your project.
- Develop tasks sequences
Step 2: Choose a topic
- Develop tasks sequences
- Develop tasks durations
- Develop activities (tasks) in Primavera
- Create a schedule
Step 3: Discussion and Conclusion:
- Create relations between activities (tasks)
- Calculate the critical path
- Prepare a presentation to explain what you accomplished and learned from this project.
NOTE:
- Your references should include at least 5 peer-reviewed articles.
- Be sure to use the CSU-Global Library.
- Remember to list your references according to the CSU Global Guide to Writing and APA or Purdue’s OWL.
- Your paper needs to be in a format that includes an abstract, introduction, literature, main body and conclusion.
- The final report needs to be 6-8 pages, which include your abstract (double-spaced, 12 point, Times New Roman)