Answered You can hire a professional tutor to get the answer.
Please help me answer this operation management question using PERT
to OneDriveA PERT project is detailed in the table below. Durations are given in days.Pessimistic durationLikely durationActivityPredecessorsOptimistic duration361240B72C32D4052E364240B,C3460F.HOptimistic durationLikely durationActivityPredecessorsPessimistic durationE,44504844F. H, IJ. K32445440N3642720M. N2023KO2426. Draw a network representing this project.b. Give the expected duration and variance of each activity in a table.c. What is the expected duration of the project?