Answered You can hire a professional tutor to get the answer.
Please solve equation. 240 milliion sales = C + 0.2C (C is the unknown of total costs and expenditures).
Please solve equation. 240 milliion sales = C + 0.2C (C is the unknown of total costs and expenditures)."
Please solve equation. 240 million sales = C + 0.2C (C is the unknown of total costs andexpenditures)."Ans.240 million sales = C+0.2 C= (1+0.2) C= 1.2 C(240 million sales)/ 1.2 = CSo,...