Answered You can hire a professional tutor to get the answer.
Problem 7-2 A job was timed for 60 cycles and had an average of 2.0 minutes per piece. The performance rating was 98 percent, and workday allowances...
Problem 7-2
A job was timed for 60 cycles and had an average of 2.0 minutes per piece. The performance rating was 98 percent, and workday allowances are 19 percent. Determine each of the following:
a. Observed time. (Round your answer to 1 decimal place.)
Observed time minutes
b. Normal time. (Round your answer to 2 decimal places.)
Normal time minutes
c. Standard time. (Round your answer to 2 decimal places.)
Standard time minutes