Answered You can buy a ready-made answer or pick a professional tutor to order an original one.

QUESTION

PROF washington watson

Purpose of Assignment

The purpose of the assignment is to develop students' abilities in using datasets to apply the concepts of sampling distributions and confidence intervals to make management decisions.

Assignment Steps

Resources: Microsoft Excel®, The Payment Time Case Study, The Payment Time Case Data Set 

Review the Payment Time Case Study and Data Set.

Develop a 700-word report including the following calculations and using the information to determine whether the new billing system has reduced the mean bill payment time:

  • Assuming the standard deviation of the payment times for all payments is 4.2 days, construct a 95% confidence interval estimate to determine whether the new billing system was effective. State the interpretation of 95% confidence interval and state whether or not the billing system was effective.
  • Using the 95% confidence interval, can we be 95% confident that µ ≤ 19.5 days?
  • Using the 99% confidence interval, can we be 99% confident that µ ≤ 19.5 days?
  • If the population mean payment time is 19.5 days, what is the probability of observing a sample mean payment time of 65 invoices less than or equal to 18.1077 days?

Format your assignment consistent with APA format. 

Show more
  • @
  • 165 orders completed
ANSWER

Tutor has posted answer for $70.00. See answer's preview

$70.00

********** ******* SystemThe concept ** *** **** study ** **** ******** ** ****** ******** ********* ** *** **** ** the ******* there ****** in *** *** *** ********* make ******** ******* *** *** of * *** ********** ******* ****** intended ** *** ******* the time ***** by *** ********* ** pay ***** ** expected ** ** ******* *** ****** ***** ******** ** *** customers *** they *** expected ** **** ******** ***** ** the ******* *********** *** checking ** *** ********* are supposed ** ** **** ****** the ******* ** **** The ******* *** ** *** ******** ****** **** **** ** average of ** **** between *** **** *** ******* ** **** ** *** ******** *** *** *** ** ** received ***** *** *** ********** ****** *** mean ******* *** ******* time is supposed ** ****** ** *** ***** *** ********* *********** the company wishes ** **** *** ** *** ****** ** ********* *** can ****** the ******* and ******* time Through *** ******** ** *** **** *** ******* **** **** ** **** * strategy ** ****** *** system to ***** ******* ***** the **** ****** *** **** value ** *** **** taken ** *** ***** ********* is *** known *** *** ******** ********* *** been similar ** different ********* *** ******** ********* ** 42 ******* Confidence ****************** ** the ******** of *** **** *** mean ***** ** *** ****** of ** *** ******* with * standard ********* ** 396123 The standard error ** *** **** of *** data *** ****** *** maximum and *** ******* ****** ** *** **** **** ** and *** respectively The *********** from the descriptive ********** *** **** in *** *********** ** *** ********** intervals ** the data According ** *** ******** *** ******* needed ** ** *** confident **** *** mean ***** ** the **** *** **** **** or equal ** *** *************************** ********************************* ********************* ***************************************************************************************** **** a ******** the **** *** *** *********** hypothesis ** the **** **** ****** *** null ********** ****** **** *** mean ***** of the days *** ******* **** *** ***** the alternative hypothesis stated **** *** **** was **** than ** ***** ** 195 **** ***** the MS Excel the ********* was *** output ** *** ********** ******** ** *** ************ ******** * ***************** ******************************** ************************************* ********** limit171447lower confidence limit *** confidence ********* **** *** ******** ** *** **** showed **** *** ***** limit was 171447 ***** *** ***** limit ** *** **** was ****** ********* ** *** *********** acquired **** the ******** it *** clear that *** *********** hypothesis was ******** *** **** ***** ** *** ******* time ** **** *** **** **** or ***** ** *** **** The ******* ****** therefore ***** ***** *** *** ****** ** **** *** *** sure **** *** days *** reduced *** **** than 195 days99% Confidence IntervalThe **** ******** *** **** ** ******* *** ** *** company could ** *** ********* **** *** mean number of **** *** **** than ** equal ** 195 days *** **** *** *** *********** hypothesis ******** the **** *** values of the *********** ********** **** ******** *** **** ** *** **** **** *** ***** **** ***** the ******** *** ********* ******* **** ****************** ******** - mean99%confidence ******************************** dev65n2576z12656half-width193733upper confidence **************** confidence limit According to *** ****** from *** MS ***** *** **** showed **** *** lower limit was 168421 while *** upper ***** *** ****** *** value of the ************ **** *** ******* **** the ****** ******** and *** ******* *** interval ***** *** ** ****** ******** ** ******* the **** ********** Therefore the ******* concluded **** the **** value *** **** than *** days The ******* should therefore **** *** strategies to market *** ****** ** ***** ********* as ***** *** been * *********** reduction in *** ****** ** payment days *** ******* *** **** * ******* ******** to ******* the *** ******* *** **** with *** *** *******

Click here to download attached files: Week 4 dataset...xlsx
Click here to download attached files: Electronic Billing System (1).docx
or Buy custom answer
LEARN MORE EFFECTIVELY AND GET BETTER GRADES!
Ask a Question