Waiting for answer This question has not been answered yet. You can hire a professional tutor to get the answer.
Project Change Control Discussion Paper
Address the following questions in a 350- to 700-word paper:
- How are the work breakdown structure and the change control plan connected?
- What are the likely outcomes if a change control process is not used? Why?
Format your paper consistent with APA guidelines.