Answered You can buy a ready-made answer or pick a professional tutor to order an original one.

QUESTION

STATS Assignment 3 Questions

1.The critical path of a network is the

A) shortest time path through the network.

B) path with the fewest activities.

C) path with the most activities.

D) longest time path through the network.

E) None of the above

2.The first step in planning and scheduling a project is to develop the

A) employee scheduling plan.

B) PERT/CPM network diagram.

C) critical path.

D) work breakdown structure.

E) variance calculations for each activity.

Table 13-4

The following represents a project with known activity times. All times are in weeks.

Activity    Immediate

Predecessor    Time

A    -    4

B    -    3

C    A    2

D    B    7

E    C, D    4

F    B    5

G    E, F    4

3. Using the data in Table 13-4, what is the minimum possible time required for

completing the project?

(a) 8

(b) 12

(c) 18

(d) 10

(e) none of the above

4. Using the data in Table 13-4, what is the latest possible time that C may be started

without delaying completion of the project?

(a) 0

(b) 4

(c) 8

(d) 10

(e) none of the above

5. Using the data in Table 13-4, compute the slack time for activity D.

(a) 0

(b) 5

(c) 3

(d) 6

(e) none of the above

6. Consider a project that has an expected completion time of 50 weeks and a standard deviation of 9 weeks. What is the probability that the project is finished in 57 weeks or fewer? (Round to two decimals.)

(a) 0.68

(b) 0.78

(c) 0.22

(d) 0.32

(e) none of the above

The following table provides information for the next two questions.

Table 13-6

Activity    Immediate

Predecessor    Optimistic    Most

Likely    Pessimistic    Expec-ted t    s    s2

A    -    2    3    4    3    0.333    0.111

B    -    2    5    8    5    1.000    1.000

C    A    1    2    9    3    1.330    1.780

D    A    5    5    5    5    0.000    0.000

E    B, C    6    7    8    7    0.333    0.111

F    B    12    12    12    12    0.000    0.000

G    D, E    1    5    9    5    1.333    1.780

H    G, F    1    4    8    4.167    1.167    1.362

7. Which activities are part of the critical path?

(a) A, B, E, G, H

(b) A, C, E, G, H

(c) A, D, G, H

(d) B, F, H

(e) none of the above

8. What is the variance of the critical path?

(a) 5.222

(b) 4.364

(c) 1.362

(d) 5.144

(e) none of the above

Table 14-1

M/M/2    

Mean Arrival Rate:    9 occurrences per minute

Mean Service Rate:    7 occurrences per minute

Number of Servers:    2

Queue Statistics:    

Mean Number of Units in the System:    2.191

Mean Number of Units in the Queue:    0.905

    Mean Time in the System:    14.609 minutes

Mean Time in the Queue:    6.037 minutes    

Service Facility Utilization Factor:    0.643    

Probability of No Units in System:    0.217    

9. According to the information provided in Table 14-1, on average, how many units are in the line?

(a) 0.643

(b) 2.191

(c) 2.307

(d) 0.217

(e) 0.905

10. According to the information provided in Table 14-1, what proportion of time is at least one server busy?

(a) 0.643

(b) 0.905

(c) 0.783

(d) 0.091

(e) none of the above

11. Using the information provided in Table 14-1 and counting each person being served and the people in line, on average, how many people would be in this system?

(a) 0.905

(b) 2.191

(c) 6.037

(d) 14.609

(e) none of the above

12. According to the information provided in Table 14-1, what is the average time spent by a person in this system?

(a) 0.905 minutes

(b) 2.191 minutes

(c) 6.037 minutes

(d) 14.609 minutes

(e) none of the above

13. According to the information provided in Table 14-1, what percentage of the total available service time is being used?

(a) 90.5%

(b) 21.7%

(c) 64.3%

(d) It could be any of the above, depending on other factors.

(e) none of the above

Table 14-5

M/D/1    

Mean Arrival Rate:    5 occurrences per minute

Constant Service Rate:    7 occurrences per minute

Queue Statistics:    

Mean Number of Units in the System:    1.607

Mean Number of Units in the Queue:    0.893

Mean Time in the System:    0.321 minutes

Mean Time in the Queue:    0.179 minutes

Service Facility Utilization Factor:    0.714

14. According to the information provided in Table 14-5, which presents the solution for a queuing problem with a constant service rate, on average, how much time is spent waiting in line?

(a) 1.607 minutes

(b) 0.714 minutes

(c) 0.179 minutes

(d) 0.893 minutes

(e) none of the above

15. According to the information provided in Table 14-5, which presents the solution for a queuing problem with a constant service rate, on average, how many customers are in the system?

(a) 0.893

(b) 0.714

(c) 1.607

(d) 0.375

(e) none of the above

16. According to the information provided in Table 14-5, which presents a queuing problem solution for a queuing problem with a constant service rate, on average, how many customers arrive per time period?

(a) 5

(b) 7

(c) 1.607

(d) 0.893

(e) none of the above

Table 15-2

A pharmacy is considering hiring another pharmacist to better serve customers. To help analyze this situation, records are kept to determine how many customers will arrive in any 10-minute interval. Based on 100 ten-minute intervals, the following probability distribution has been developed and random numbers assigned to each event.

Number of Arrivals    Probability    Interval of Random Numbers

6    0.2    01-20

7    0.3    21-50

8    0.3    51-80

9    0.1    81-90

10    0.1    91-00

17. According to Table 15-2, the number of arrivals in any 10-minute period is between 6 and 10, inclusive. Suppose the next three random numbers were 18, 89, and 67, and these were used to simulate arrivals in the next three 10-minute intervals. How many customers would have arrived during this 30-minute time period?

(a) 22

(b) 23

(c) 24

(d)25

(e) none of the above

18. According to Table 15-2, the number of arrivals in any 10-minute period is between 6 and 10, inclusive. Suppose the next three random numbers were 20, 50, and 79, and these were used to simulate arrivals in the next three 10-minute intervals. How many customers would have arrived during this 30-minute time period?

(a) 18

(b) 19

(c) 20

(d)21

(e) none of the above

19. According to Table 15-2, the number of arrivals in any 10-minute period is between 6 and 10 inclusive. Suppose the next 3 random numbers were 02, 81, and 18. These numbers are used to simulate arrivals into the pharmacy. What would the average number of arrivals per 10-minute period be based on this set of occurrences?

(a) 6

(b) 7

(c) 8

(d)9

(e) none of the above

Table 15.3

A pawn shop in Arlington, Texas, has a drive-through window to better serve customers. The following tables provide information about the time between arrivals and the service times required at the window on a particularly busy day of the week. All times are in minutes.

Time Between Arrivals    Probability    Interval of Random Numbers

1    0.1    01-10

2    0.3    11-40

3    0.4    41-80

4    0.2    81-00

Service Time    Probability    Interval of Random Numbers

1    0.2    01-20

2    0.4    21-60

3    0.3    61-90

4    0.1    91-00

The first random number generated for arrivals is used to tell when the first customer arrives after opening.        

20. According to Table 15-3, the time between successive arrivals is 1, 2, 3, or 4 minutes. If the store opens at 8:00a.m. and random numbers are used to generate arrivals, what time would the first customer arrive if the first random number were 02?

(a) 8:01

(b) 8:02

(c) 8:03

(d)8:04

(e) none of the above

21. According to Table 15-3, the time between successive arrivals is 1, 2, 3, or 4 minutes. The store opens at 8:00a.m. and random numbers are used to generate arrivals and service times. The first random number to generate an arrival is 39, while the first service time is generated by the random number 94. What time would the first customer finish transacting business?

(a) 8:03

(b) 8:04

(c) 8:05

(d)8:06

(e) none of the above

22. According to Table 15-3, the time between successive arrivals is 1, 2, 3, or 4 minutes. The store opens at 8:00a.m. and random numbers are used to generate arrivals and service times. The first 3 random numbers to generate arrivals are 09, 89, and 26. What time does the third customer arrive?

(a) 8:07

(b) 8:08

(c) 8:09

(d)8:10

(e) none of the above

23. According to Table 15-3, the time between successive arrivals is 1, 2, 3, or 4 minutes. The store opens at 8:00a.m. and random numbers are used to generate arrivals and service times. The first two random numbers for arrivals are 95 and 08. The first two random numbers for service times are 92 and 18. At what time does the second customer finish transacting business?

(a) 8:07

(b) 8:08

(c) 8:09

(d)8:10

(e) none of the above

Table 15-4

Variable Value    Probability    Cumulative Probability

0    0.08    0.08

1    0.23    0.31

2    0.32    0.63

3    0.28    0.91

4    0.09    1.00

Number of Runs    200    

Average Value    2.10    

24. According to Table 15-4, which presents a summary of the Monte Carlo output from a simulation of 200 runs, there are 5 possible values for the variable of concern. If this variable represents the number of machine breakdowns during a day, what is the probability that the number of breakdowns is 2 or fewer?

(a) 0.23

(b) 0.31

(c) 0.32

(d)0.63

(e) none of the above

25. According to Table 15-4, which presents a summary of the Monte Carlo output from a simulation of 200 runs, there are 5 possible values for the variable of concern. If this variable represents the number of machine breakdowns during a day, what is the probability that the number of breakdowns is more than 4?

(a) 0

(b) 0.08

(c) 0.09

(d)1.00

(e) none of the above

26. According to Table 15-4, which presents a summary of the Monte Carlo output from a simulation of 200 runs, there are 5 possible values for the variable of concern. If this variable represents the number of machine breakdowns during a day, based on this simulation run, what is the average number of breakdowns per day?

(a) 2.00

(b) 2.10

(c) 2.50

(d)200

(e) none of the above

Show more
  • @
  • 177 orders completed
ANSWER

Tutor has posted answer for $20.00. See answer's preview

$20.00

**** ******** path ** * ******* ** the

** ******** **** path ******* *** ********

B) **** with *** ****** ***********

C) path **** *** **** activities

** ******* **** **** ******* *** ********

** **** ** *** ******

2The ***** **** ** ******** and scheduling * ******* ** ** develop the

** ******** ********** *****

** ******** ******* ********

C) ******** *****

D) work breakdown structure

** ******** ************ *** **** *********

***** *****

*** following represents * ******* **** ***** ******** times *** ***** *** ** weeks

******** Immediate

Predecessor *****

* * **

* - **

* A **

* * **

E C * **

* B 5

* E * 4

* Using the data in ***** **** **** is *** ******* possible **** ******** ****

********** *** project?

*** 8

*** ***

*** ***

(d) ***

*** **** ** *** ******

* ***** the **** ** Table 13-4 **** ** *** ****** ******** **** **** * *** ** started

******* ******** ********** ** *** *********

(a) ***

** ***

** ***

*** (e)

**** of the ****** *

***** *** **** ** Table **** ******* *** slack **** for ******** D ***

(b) 5

*** 3

*** **

*** none

** *** ****** * ********

* ******* **** *** an ******** ********** **** ** ** ***** *** a ******** ********* of * ***** What ** the *********** **** *** ******* ** ******** ** ** ***** ** fewer? ****** to two decimals) *** ****

(b) 078

*** ****

*** ****

*** none

of *** ****** *** *********

***** ******** information *** the **** *** questions Table *****

******** Immediate

*********** **********

***** ****** ***********

Expec-ted * * *** * *

2 3 4 * **** 0111 * *

2 5 * * 1000 ***** * *

* 2 9 3 **** ***** * *

5 * * * 0000 ***** * B

C * * 8 * **** ***** F *

** ** ** 12 **** ***** * *

E * * * * **** ***** * G

* * * * 4167 **** ***** * *****

********** are **** ** the ******** path? *** *

* * * ** *** A

* E * ** *** *

* * ** (d) *

F ** *** ****

** *** above 8 What

** *** ******** ** *** ******** ****** *** *****

*** 4364

(c) *****

*** *****

*** none

** the above ***** *****

M/M/2 ****

Arrival Rate:

* *********** *** minute **** Service *****

7 *********** *** minute ****** of Servers:

** Queue *********** ****

Number

** ***** **

*** System: ***** **** ****** ** ***** **

*** ****** ***** **** **** ** *** *******

***** ******** Mean **** in *** ******

**** minutes ******* ******** *********** ******* 0643 ***********

** No ***** in ******* ****

* According ** *** *********** provided ** *****

****

** average *** many ***** are ** *** ****** *** ***** *** ***** *** ***** (d) ***** ***

0905 **

********* **

the ***********

******** in

Table 14-1

**** proportion ** **** ** ** least *** ****** busy? (a) ***** *** ***** *** ***** (d) ***** (e)

**** **

*** ******

** *****

*** ***********

provided in ***** **** and

******** **** ****** being ****** *** *** ****** ** line ** average *** **** ****** ***** be in **** ******** *** ***** (b) 2191 *** ***** (d) 14609 (e)

none of

*** ******

** *********

** ***

*********** ******** in Table ****

**** ** *** average **** ***** ** * ****** ** this system? *** **** ******** *** **** minutes *** 6037 ********

*** ***** ********

(e) **** **

the above 13

********* to ***

*********** ******** in ***** ****

**** ********** ** the total available ******* **** ** ***** ****** *** 905% *** ***** (c) ***** *** ** *****

** ***

of the

***** *********

** ***** ******** *** **** ** *** above Table 14-5 ***** Mean

Arrival Rate: * *********** ***

******* Constant

******* *****

7 *********** *** ******* ***** *********** ****

****** of ***** ** *** ******* *****

Mean

****** of *****

** the Queue: ***** Mean **** ** the

System: **** minutes **** Time ** *** ******

**** ******** Service ******** *********** ******* 0714

** According ** the information ******** **

***** 14-5 ***** presents ***

******** for * queuing problem **** * ******** ******* rate ** average how **** **** is ***** ******* ** ****** *** **** ******** *** **** ******** *** **** ******** *** **** ********

(e) **** **

the above 15

********* ** ***

*********** ******** **

***** 14-5 ***** presents ***

******** *** * ******* ******* **** * constant service **** on average how many ********* *** ** the system? *** ***** *** ***** (c) ***** *** 0375 (e) **** ** ***

****** **

********* **

the information

******** **

***** **** ***** presents a

queuing ******* ******** *** * ******* problem **** * ******** ******* **** ** average *** **** ********* ****** per time ******** (a) ** *** ** (c) 1607 *** 0893 (e) **** ** the

****** *****

***** *

pharmacy **

*********** ******

******* pharmacist to better *****

********* **

**** ******* **** ********* ******* are **** ** ********* *** **** ********* **** ****** ** *** ********* ******** Based on *** ten-minute intervals the ********* probability ************ *** **** developed *** random ******* ******** ** **** ****** Number ** Arrivals Probability ******** ** Random ******** * ** 01-20 *

**

21-50 8 ** 51-80 * ** ****** 10

01 ****** **

According to *****

15-2 the ******

of arrivals in

*** 10-minute ******

is ******* * and ** ********* Suppose *** next three ****** ******* **** 18 ** *** 67 and these **** used ** ******** ******** ** *** **** ***** 10-minute ********* How **** customers ***** have arrived during this ********* **** ******** *** *** *** 23 *** *** ****** (e) **** ** *** ****** **

********* to

***** ****

*** ******

**

******** ** *** ********* ******

** between 6 *** ** ********* Suppose *** **** ***** ****** ******* were 20 ** and ** *** ***** **** used ** simulate ******** ** *** **** ***** ********* ********* *** **** customers would have ******* ****** this ********* **** period? *** *** *** *** (c) *** (d)21 (e) none ** the ****** **

********* to

***** 15-2

*** number

**

arrivals ** any ********* ******

is ******* * *** ** ********* ******* the **** 3 ****** ******* were ** ** *** 18 These ******* are used ** simulate arrivals **** *** ******** **** would *** ******* number ** arrivals per ********* period ** based ** **** *** ** ************* (a) 6 *** 7 *** 8 ***** (e) **** ** *** above *****

**** *

**** ****

in Arlington

*****

*** * ************* ****** **

****** *****

********* *** ********* tables ******* *********** ***** *** **** between ******** *** *** service times required ** the ****** ** * particularly busy day of *** **** *** times *** ** ******** **** Between ******** *********** ******** ** Random ******** * ** 01-10 * 03

******

3 ** 41-80 * ** 81-00 ******* Time

*********** ******** of

****** ******** *

** ****** 2

04 ****** *

**

****** 4 ** 91-00 *** ***** ******

****** generated ***

******** ** ****

** tell ****

*** ***** ********

******* ***** opening ** According to ***** **** *** time between successive arrivals is 1 * * ** 4

minutes If the store ***** ** ****** *** random ******* *** **** to generate arrivals **** **** ***** *** ***** ******** ****** if *** ***** ****** ****** **** **** *** ***** *** ***** (c) 8:03 ******** *** **** of the ****** ** ********* ** *****

15-3 ***

**** between

********** ********

**

* * * ** *

******* *** ***** ***** ** ****** *** ****** ******* are **** ** ******** arrivals and ******* ***** The ***** random ****** ** generate an ******* ** ** while the ***** service **** ** ********* ** *** ****** ****** ** **** time would *** ***** customer ****** *********** ********** *** ***** *** ***** *** 8:05 ******** *** **** ** *** ****** ** ********* ** *****

**** ***

**** *******

********** ********

**

1 * * ** 4

******* *** ***** ***** at ****** *** ****** numbers *** used to ******** ******** and service ***** The ***** * ****** ******* ** ******** ******** *** ** ** and ** **** **** **** *** ***** customer ******** (a) ***** (b) ***** (c) ***** (d)8:10 (e) **** ** the ****** ** ********* to Table

**** the

**** between

********** ********

**

1 * * ** *

******* *** store opens at 8:00am and ****** ******* *** used ** ******** ******** *** ******* ***** The ***** *** ****** ******* *** ******** *** 95 *** ** *** ***** *** ****** numbers *** ******* ***** *** 92 *** ** At **** time does the ****** ******** finish transacting business? (a) ***** *** 8:08 (c) ***** ******** *** **** ** the ****** ***** ***** ******** *****

*********** **********

************ 008

**** *

***

031 * 032 **** 3

*** ****

*

009 **** Number ** Runs

*** *******

***** *** **

********* to *****

**** ***** presents

* ******* of

the

Monte ***** ****** **** *

********** ** 200 runs

there are * ******** ****** for *** variable ** ******* ** **** ******** ********** *** ****** of ******* ********** during * *** **** ** *** *********** **** the ****** ** breakdowns is * ** ******* (a) **** *** 031 *** **** (d)063 *** none ** *** ****** ** ********* ** ***** 15-4 ***** ******** *

summary **

*** Monte

Carlo ******

****

* simulation ** *** runs

***** *** 5 ******** values *** the ******** ** concern ** **** ******** represents *** number ** ******* ********** during * *** **** is *** *********** **** *** ****** ** ********** ** **** than *** (a) *** **** *** **** ******* *** none ** the ****** ** ********* ** ***** 15-4 ***** presents * *******

** ***

Monte Carlo

output ****

*

simulation of 200 **** *****

*** * ******** ****** for the ******** of ******* ** **** ******** represents *** ****** ** machine breakdowns ****** * *** ***** on **** ********** *** **** is the ******* ****** ** ********** *** day? (a) 200 (b) **** *** 250 ******* (e) none ** *** *****

Click here to download attached files: STATS Assignment 3 Questions.docx
or Buy custom answer
LEARN MORE EFFECTIVELY AND GET BETTER GRADES!
Ask a Question