Task 1. Complete the BIA table below and use it for the remainder of the assignment. You may want to review your Lab #07 assignment where you developed a BIA table. Information needed to create the Bu
Task 1. Complete the BIA table below and use it for the remainder of the assignment. You may want to review your Lab #07 assignment where you developed a BIA table. Information needed to create the Business Functions and Processes below are in the “Project Management Plan” scenario and the “Project Health Network Visual”. Hint: look at the processes that go from the customers and into the systems/applications in the “Project Health Network Visual”.
Business Function or Process
Business Impact Factor
Recovery Time Objective
IT Systems/Apps Infrastructure Impacts
Task 1: Business Impact Analysis – extracts from the Boiler Plate
1. Overview
This Business Impact Analysis (BIA) is developed as part of the contingency planning process for the HNetExchange Message system, HNetConnect Directory system and HNetPay Payment system. It was prepared for Health Network, Inc (Health Network).
2. System Description
<In this section, provide a general description of the system architecture (hardware, software, databases, etc) and functionality as provided in the scenario and visual. Indicate the operating environment (i.e. Data Center, etc), physical location, general location of users, and partnerships with external organizations/systems. Include information regarding any other technical considerations that are important for recovery purposes, such as backup procedures or the lack of backup procedures.>
3.1.1 Identify Outage Impacts and Estimated Downtime
Estimated Downtime
The table below identifies the MTD, RTO, and RPO for the organizational business processes that rely on the HNetExchange Message system, HNetConnect Directory system and HNetPay Payment system.
<Complete the tables below for each system using the RTO from your BIA table and estimating the MTD and RPO based on any drivers that might determine their values (e.g., mandate, workload, performance measure, etc.).>
Mission/Business Process
For HNetExchange
MTD
RTO
RPO
Mission/Business Process
For HNetConnect
MTD
RTO
RPO
Mission/Business Process
For HNetPay
MTD
RTO
RPO
Task 2: Business Continuity Plan – extracts from the Boiler Plate
<After discussions with management, the organization implemented the following Back-up Plan: all database files are backed-up to tape at the end of the day. These tapes are then stored offsite. The HNetPay data is backed-up daily and retained for 6 months. The HNetMessage messages are backed-up daily and retained for 3 months. All other data is backed-up weekly and retained for 60 days. If the BCP is executed, the most current tapes are copied and mailed to the alternate site.
Modify the statements below to reflect this decision.>
Emergency management standards
Data backup policy
Full and incremental backups preserve corporate information assets and should be performed on a regular basis for audit logs and files that are irreplaceable, have a high replacement cost, or are considered critical. Backup media should be stored in a secure, geographically separate location from the original and isolated from environmental hazards.
Department-specific data and document retention policies specify what records must be retained and for how long. All organizations are accountable for carrying out the provisions of the instruction for records in their organization.
IT follows these standards for its data backup and archiving:
Tape retention policy
Backup media is stored at locations that are secure, isolated from environmental hazards, and geographically separate from the location housing the system.
Billing tapes
· Tapes greater than three years old are destroyed every six months.
· Tapes less than three years old must be stored locally off-site.
· The system supervisor is responsible for the transition cycle of tapes.
System image tapes
· A copy of the most current image files must be made at least once per week.
· This backup must be stored offsite.
· The system supervisor is responsible for this activity.
Off-site storage procedures
· Tapes and disks, and other suitable media are stored in environmentally secure facilities.
· Tape or disk rotation occurs on a regular schedule coordinated with the storage vendor.
Access to backup databases and other data is tested annually
Task 3: Disaster Recovery Plan – extracts from the Boiler Plate
<There are 3 Systems Identified in the “Project Risk Management Plan”. For this assignment, fill out the following Appendixes for each SYSTEM. Complete all areas below that are highlighted.>
Disaster Recovery Plan for <HNetPay>
OVERVIEW