Waiting for answer This question has not been answered yet. You can hire a professional tutor to get the answer.
The prime cost of Job No. 55 was $2,500. Manufacturing Overhead was applied based on machine hours. The POHR was $90 per machine hour. Assuming Job No. 55 needed 20 machine hours to complete, calculat
The prime cost of Job No. 55 was $2,500. Manufacturing Overhead was applied based on machine hours. The POHR was $90 per machine hour. Assuming Job No. 55 needed 20 machine hours to complete, calculate the cost of Job No. 55