Answered You can buy a ready-made answer or pick a professional tutor to order an original one.
This assignment consists of two (2) sections: a business requirements document and a
Project Deliverable 2: Business Requirements
Due Week 4 and worth 110 points
This assignment consists of two (2) sections: a business requirements document and a project plan. You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment it is written for. Additionally, you may create and / or assume all necessary assumptions needed for the completion of this assignment.
Procuring quality business requirements is an important step toward the design of quality information systems. Completion of a quality requirements document allows user needs and expectations to be captured, so that infrastructure and information systems can be designed properly. Your company, which is a data-collection and analysis company that has been operating less than two (2) years, is seeking to create a repository for collected data beyond standard relational databases. Your ten (10) terabyte data warehouse is expected to grow by 20% each year. You are mindful of data warehousing best practices which will aid you immensely in your requirements gathering effort. Using the requirements document provided in the course shell, you are to speculate on the needs of the company. You must consider current and future requirements; however, assumptions should be realistic and carefully considered.
Section 1: Business Requirements Document
- Write a four to six (4-6) page original business requirements document for the project plan using the template provided. Note: The template is provided under the Additional Resources in the Student Center tab of the online course shell.
- Describe the project including the following:
- Describe and define the scope of the project.
- Speculate as to how to control the scope.
- Identify possible risks, constraints, and assumptions.
- Describe the relationship and integration between systems and infrastructure. Note: Database and Data Warehousing, Analytics, Interfaces and Cloud Technology, and Infrastructure and Security should be considered.
- Speculate upon potential outsourcing or offshoring needs.
- Identify and justify the necessary resources including staffing that are necessary.
- Define relevant terms that will be used throughout project.
- Use at least two (2) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.
- Describe the project including the following:
- @
- 165 orders completed
- ANSWER
-
Tutor has posted answer for $30.00. See answer's preview
******* nameProfessor ********* *************** ******** Requirements11 Project ************ ** considered as *** ********* asset ** all **** ** ************* *** *** **** analytics *** Data Collection ******* *** ********** of *** data ** **** **** **** **** *** ********** ** *** data ** *** ***** ************* ***** *** ******** ** *** company is directly ***** ** the organization of *** **** *** ** the ******* ** ******* ******** ** *** ********* **** in *** ****** years *** *** ****** expected ** ****** 20% **** coming year (Lewis ****** ***** there is ** ****** need ** ********* to **** warehouse from *********** **** **** This **** warehouse **** ******* *** ******* ******** *** *********** ****** ** **** ** the ************** Background including current *********** ******* ** ** ********* the **** ********* *** *** ************** is ****** to ** **** ** *** ********* ********* ******* **** ** ** ******* * **** ********* ****** ***** **** ******* ** ********* **** of **** ** * *********** ********** ********** ****** *** **** ******* **** ****** of *** data ** *** the ************ of *** ******* ** **** *** this ******* is ** ********* *** the ********* ********* of *** ******* with *** data ********* and the infrastructure13 Scope131 ***** of ProjectThere *** ********* areas **** are required for the *********** and ************** ** *** **** ********* *** each **** ** needed ** ** ************ ****** *** ****** **** ********* *** ** ********************** *** ************ ***** will ** *********** within *** target ********** **** are **** ********* *********** data analytics *********** *** **** integration *********** *** names ** ***** applications are **** mart application; ****** ********** processing ******* online *********** processing ******* and predictive ************* **** ************** **** ******* *** *** office ********* ** *** company ** *** the ************** ************** ************** **** **** in the *********** *** *********** ** the ********* ************** ****** *** ************ *** redesigning **** ** ******* ** *** **** **** *** ********** ********************* There *** ********* ************** required *** the **** ********* *** these **** be limited to **** ******* *********** ******** using the **** schema; ********** of *** **** ********** *** ********** of the **** ******************* *** ********** ******** in *** ************** *** user interfaces; ******** ******** ********** ******** interface; ********* ********** ****** software ********* *** the ******** ********************* ********* ************ *** *********** will ******* *********** ******** connectivity; database ********** *** network accessConversion *** ********* **** ****** *** ****** **** ** ********** *** *** **** ********** ***** *** ************** business data operations **** *** *** *** ******** **** *** **** ** the ***************** Testing ** *** data ********* implementation **** ******* three ***** ** ******* and these are unit ******** ****** ******* *** integration ************** ******* ******* ** ******* ** *** **** *********** *** ***** *** data ********* ** ***** *********** Each ********** will contribute individually ** ***** ** get *** adequate funds for *** ********************** *** training for *** **** warehouse will ******* *** *** ************ ** *** ********** *** all the *********** *** ***** *** **** ********* ** ***** ******************** ********* **** ******* ********* the ** **** and *** ***** ********** **** **** ** ******** *** *** **** ****** *** ***************** Constraints and ******************** constraints *** have **** ************** *** *** ******** ******* ** *** **** ****** **** ** ******** ** *** ******** ** *** data *********** The **** warehouse project implementation **** meet the requirements *** ** the ********** and **** ******* *** access ************** *** implementation ** *** ******* **** be completely **** ** *** coming six ********* The ************** ******** ***** **** for the *************** ** ***** on *** ************** *** ******* ** *** individual ********* This *** of ************** ** going ** use *** **** ********* ** order to achieve best ********** This **** ********* will include ******* ********** *** access ******* methods **** will eliminate *** unauthorized access of *** ******* This **** warehouse **** ** *** one ******* to the *********** **** warehouse *** will ******* components **** ** operational data store ****** **** ********* (DW); staging **** ***** *** data **** (DA) ** case *** implementation provides the **** solution• *** ************ ***** ** *** system **** ******* *** business intelligence ****** *** **** system **** **** to provide *** **** based ********* *** ********* No health information exists ** *** **** **** ***** hence ***** ** ** *********** ** ***** **************** defining the *********** ***** *** ******** *** *** ************** ***** assumptions *** ******** **** *********** *** ************** **** ** very ********** *** the ****** of *** ***** ** *** ************** ** **** ********* ***** it **** impact *** timeline• ***** constraint: *** ***** ********** ** there to ******* *** ***** ** *** *** stakeholders• **** constraint: *** ************** ** ***** ** *** **** ************* **** all *** ************** Schedule *********** *** ************** is ***** ** ******** internal projects and ***** ***************** ******** *********** The ******** requirement is very ***** ***** *** *** ********* *** ********* ** multiple tasks ******* * *** ********* ************** *********** There ** * ***** *********** in ********** ** *** implementation and ** ****** ** ********** ************ *********** *** **** ********* FERPA compliance need ** ** ********** very carefully133 ********** *** be ******** ***** that *** impact *** ******** *** *** ************** of the ******* and the various types ** the risks *** ********* below:• Resource Risk:There ** ******* ************ ** the *** ***** **** ** *** **** **** administrators and the *** IT ***** ************ *** *** ***** ** ******* ****** ** the ******** assignments and **** can impact *** ******** of *** data ware ***** ************** ** ***** ** **** with **** **** *********** number ** ********* is needed ** be hired *********** ** **** *** ******* *** ** ********** *********** Finance Risk:The ***** *** *** ************** is ***** ** *** various investment **** *** ******** *********** *** it is very **** ********* ** **** *** **** inflow ** that the ******* ***** circulating *********** ***** ** ***** *** ********** ***** **** the ******** ********** then it ***** **** ** *** ***** ** the implementation ** the ******** ******** M1994)• ********** ********* type of risk ** *** technology risk *** **** ** ***** ** *** choice of the technology **** *** the ********* implementation ** inappropriate ****** made for the ********** ***** **** a ******** ****** ** *** ************** *** hence ** ** *********** to choose *** ********** **** ****** ** **** ** *** ** **** ****** progression• ******** Risk:Another type ** *** **** ** *** **** ***** ** *** ** *** *********** ***** ** the ******** this ***** ** *** to ******** ******* **** ** other ******** ********* ************ ***** ********** or other ********* ****** ** ******* Hence ** is *********** ** ********* ******* *** implementation ********** ** ** ** ***** *** various ***** **** ***** *** to the ******** ***** ( Ricciuti M1994) 134 ***** ********** ***** ** the ******* can ** ********** ** multiple ******** *** *** **** sources ** the ********* *********** *** **** *** to be ********** and these **** ******* **** ** ********** out of ******** *** the existing ******* *** ****** ** ** ******** but ** should not cover *** departments *** **** ***** **** *** ************* No enhancements are ****** ** the source system which ******** the ***** ** *** **** warehouse• Answering ********* ***** need *** be accessed for * ********** period of **** **** ** be separated and **** *** ** ** ******** ** *** implementation135 Relationship ** ***** Systems/ProjectsThere *** various ***** ******** and ***** ******** ****** *** implementation of *** data warehouse and ************** ******** ********* *********** ******* ** * **** ********* ******* is to **** ***** companies in providing **** ******** *** **** *** ** ******** in multiple ******* ** **** *** ******* ** *** **** ********* implementation ** to provide *** organized data *** **** ******* ***** ** *** ************** of **** ********* *** **** **** ********* ****** needs ** ** ********** **** the **** ********* *** this ************** ** ******** *** ********* ******* ***** ** ** carefully *********** ***** ** **** impact *** warehouse ***************** ***** Computing ******************** ** a ****** ***** implementation and **** ***** ************** **** the ****** ** *** ***** ***** ******* ******** *** ***** **** ************** ** *** ***** ********* are ****** to ** ********** **** the **** ********* ******* ** needs ** be ********* integrated **** *** ***** service ******** The Cloud computing implementation ***** to ** carefully ******** ***** ** **** impact *** ********* implementation• ******************** *** ******* ************** ************ for all *** ******* ********* *** ************** *********** *** *** **** ********* ** ******* ********* ********* ****** ** ******** ** be *********** and **** ******* *** ************** ** *** data warehouse and ***** *** ************** ** ****** to ** ********* observed Hence *** ************** ****** ***** ** ** carefully ******** *** analyzed The ********* ************** ***** ** ** ********* ******** ***** ** **** ****** the warehouse ******************* ******** ****************** ******** ****** ** **** **** required *** *** **** ****** ** **** data secured ******* *** security implementation *** **** **** not ** secured *** hence * ******** system ** **** *** *** *********** the ******** ** the **** ****** Hence ****** *********** **** *** **** warehouse is required *** **** **** ******* *** ******** ** *** ****** *** ******** ************** ***** to ** ********* ******** since it **** ****** *** ********* implementation( ******* J ********** Interfacing ************** ** ** interfacing requirement ******* *** ******* systems and these interfacing **** **** ** ************ *** connection ******* *** ******* systems **** connection *** interfacing ** **** **** ******** ***** *** ******* systems ** ***** to implement the **** ********* the *********** ***** ** ** ********* done ***** *** *********** defines *** ******* ** the **** ********* ***** interfacing *********** ** very ********* The interfacing needs ** ** ********* ******** since ** **** ****** *** warehouse implementation • Databases to Data *************** *** *** *** ******** databases ** ****** ** ** converted to *** **** warehouse ****** *** **** ********** is very **** ********* *** ***** not *** the **** ***** *** ****** ** be ********* but ***** ***** ** be the **** ********* ************** *** *** of *** databases *** hence **** ** dependent ** *** ********* ** data warehouse implementation *** ********* need ** ** carefully ******** ***** it **** ****** the ********* ***************** ********** ** ***** *** ************** ***** This ****** ** ****** ********** processing and ***** ** ******* *** analytics• ***** **** refers ** ****** transaction ********** *** helps ** ******* *** *********** ************* ODA: **** ****** ** the *********** **** ***** *** helps ** store *** *** data Works ******** Lewis * ***** ****** **** ******* ******* building a **** ********* ** *** **** ***** ******** ************ ********* ******* *** * (2005) ********* data ********* system **** ******* ******* for ***** ****** ***** ****** ** ******* Concordia ********** (Canada)) ******** ************* *** Theses 103-103 p• ******** * ****** ******** *** brick *** **** **** warehouse boom ********* ****** **** ******* * (2006) ********** *** implementation ********** ** * credit **** ********* The *** ******* 88(10) ***********