Waiting for answer This question has not been answered yet. You can hire a professional tutor to get the answer.
This week,compileall your work from previous weeks and integrate it into your migration plan in a cohesive manner. Additional material about the transition may be required. The plan will be presented
This week,compileall your work from previous weeks and integrate it into your migration plan in a cohesive manner. Additional material about the transition may be required. The plan will be presented to the CEO, CFO, and CTO and should have a professional construction.
You will thencreatea 10- to 12-slide multimedia-rich Microsoft®PowerPoint®presentation that explains the proposed migration plan and includes the following items:
- Benefits of moving to the cloud
- One-for-one transition plan for the given requirement (e.g., the webserver will be moved to an EC2 instance that is placed behind an ELB)
- Proposed architecture diagram (how systems are set up)
- Proposed network flow diagram (how data flows through the system)
- IAM security policy plan
- Database plan