QUESTION

Top of Form 1. Problem 1: Assembly work center; Enter the total labor hours required by the ASSEMBLY work center for weeks 1 through 6 (in order)....

Top of Form

1.

Problem 1: Assembly work center; Enter the total labor hours required by the ASSEMBLY

 work center for weeks 1 through 6 (in order). Enter all numbers as one decimal of precision

(eg. 45.7)

1:

2:

3:

4:

5:

6:

2.

Problem 1: Sewing work center; Enter the total labor hours required by the SEWING

 work center for weeks 1 through 6 (in order). Enter ALL numbers as one decimal of precision

 (eg. 45.7, 49.0, etc)

1:

2:

3:

4:

5:

6:

3.

Problem 5: WC300 (total); Enter the total hours required by WC300 work center

 for Enter all numbers as a whole number (50,60,etc.).

Enter 0 for periods where no hours are required... not blank.

1:

2:

3:

4:

5:

4.

Problem 5: WC400; Enter the total hours required by WC400 work center 

Enter all numbers as a whole number (50,60,etc.).

Enter 0 for periods where no hours are required... not blank.

1:

2:

3:

4:

5:

5.

Problem 5: WC500; Enter the total hours required by WC500 work center

 Enter all numbers as a whole number (50,60,etc.).

Enter 0 for periods where no hours are required... not blank.

1:

2:

3:

4:

5:

6.

Problem 6 Part A: Week 1 minutes required; Enter the total MINUTES required in WEEK 1

for the saw, planer, router, molder, and sander (in order).

1:

2:

3:

4:

5:

7.

Problem 6 Part A: Week 2 minutes required; Enter the total MINUTES required in WEEK 2

for the saw, planer, router, molder, and sander (in order).

1:

2:

3:

4:

5:

8.

Problem 6 Part A: Week 3 minutes required; Enter the total MINUTES required in WEEK 3

 for the saw, planer, router, molder, and sander (in order).

1:

2:

3:

4:

5:

9.

Problem 6 Part C; Would you process the end panel or shelf first?

A)  End panel

B) Shelf

C) Does not matter  

10.

Problem 7 WORK CENTER 100; Enter the capacity requirement HOURS requiredin WORK

 CENTER 100 for weeks 1 through 6 (in order). Enter all numbers as a one decimal place

 precision number (5.8,7.3,etc.). Enter 0 for periods where there are no capacity requirements.

1:

2:

3:

4:

5:

6:

11.

Problem 7 WORK CENTER 200 Enter the capacity requirement HOURS required in WORK

 CENTER 200 for weeks 1 through 6 (in order). Enter all numbers as a one decimal place

precision number (5.8,7.3,etc.). Enter 0 for periods where there are no capacity requirements.

1:

2:

3:

4:

5:

6:

12.

Problem 7 WORK CENTER 300 Enter the capacity requirement HOURSrequired in WORK

 CENTER 300 for weeks 1 through 6 (in order). Enter all numbers as a one decimal place precision

number (5.8,7.3,etc.). Enter 0 for periods where there are no capacity requirements.

1:

2:

3:

4:

5:

6:

Bottom of Form

Show more