Answered You can hire a professional tutor to get the answer.
Top of Form 1. Problem 1: Assembly work center; Enter the total labor hours required by the ASSEMBLY work center for weeks 1 through 6 (in order)....
Top of Form
1.
Problem 1: Assembly work center; Enter the total labor hours required by the ASSEMBLY
work center for weeks 1 through 6 (in order). Enter all numbers as one decimal of precision
(eg. 45.7)
1:
2:
3:
4:
5:
6:
2.
Problem 1: Sewing work center; Enter the total labor hours required by the SEWING
work center for weeks 1 through 6 (in order). Enter ALL numbers as one decimal of precision
(eg. 45.7, 49.0, etc)
1:
2:
3:
4:
5:
6:
3.
Problem 5: WC300 (total); Enter the total hours required by WC300 work center
for Enter all numbers as a whole number (50,60,etc.).
Enter 0 for periods where no hours are required... not blank.
1:
2:
3:
4:
5:
4.
Problem 5: WC400; Enter the total hours required by WC400 work center
Enter all numbers as a whole number (50,60,etc.).
Enter 0 for periods where no hours are required... not blank.
1:
2:
3:
4:
5:
5.
Problem 5: WC500; Enter the total hours required by WC500 work center
Enter all numbers as a whole number (50,60,etc.).
Enter 0 for periods where no hours are required... not blank.
1:
2:
3:
4:
5:
6.
Problem 6 Part A: Week 1 minutes required; Enter the total MINUTES required in WEEK 1
for the saw, planer, router, molder, and sander (in order).
1:
2:
3:
4:
5:
7.
Problem 6 Part A: Week 2 minutes required; Enter the total MINUTES required in WEEK 2
for the saw, planer, router, molder, and sander (in order).
1:
2:
3:
4:
5:
8.
Problem 6 Part A: Week 3 minutes required; Enter the total MINUTES required in WEEK 3
for the saw, planer, router, molder, and sander (in order).
1:
2:
3:
4:
5:
9.
Problem 6 Part C; Would you process the end panel or shelf first?
A) End panel
B) Shelf
C) Does not matter
10.
Problem 7 WORK CENTER 100; Enter the capacity requirement HOURS requiredin WORK
CENTER 100 for weeks 1 through 6 (in order). Enter all numbers as a one decimal place
precision number (5.8,7.3,etc.). Enter 0 for periods where there are no capacity requirements.
1:
2:
3:
4:
5:
6:
11.
Problem 7 WORK CENTER 200 Enter the capacity requirement HOURS required in WORK
CENTER 200 for weeks 1 through 6 (in order). Enter all numbers as a one decimal place
precision number (5.8,7.3,etc.). Enter 0 for periods where there are no capacity requirements.
1:
2:
3:
4:
5:
6:
12.
Problem 7 WORK CENTER 300 Enter the capacity requirement HOURSrequired in WORK
CENTER 300 for weeks 1 through 6 (in order). Enter all numbers as a one decimal place precision
number (5.8,7.3,etc.). Enter 0 for periods where there are no capacity requirements.
1:
2:
3:
4:
5:
6:
Bottom of Form