Answered You can hire a professional tutor to get the answer.
With this larger quantity sold the variable cost of materials and production labor costs were each 20% lower than expected. What is the new
With this larger quantity sold the variable cost of materials and production labor costs were each 20% lower than expected. What is the new Contribution variance?
$2,000,000
-$720,000
Other
$1,232,000
$3,242,000