Waiting for answer This question has not been answered yet. You can hire a professional tutor to get the answer.

QUESTION

Write 13 pages thesis on the topic philharmonic hall project. For a Philharmonic Hall project to succeed, it is vital to choose competent contractors and architectures. There ought to be a good manage

Write 13 pages thesis on the topic philharmonic hall project. For a Philharmonic Hall project to succeed, it is vital to choose competent contractors and architectures. There ought to be a good management schedule in connection to the design of the architectures. This is because every phase will be completed at the right time and no phase will consume the time of the other phases. Proper time management also helps the managers to plan what is required and there is the delivery of materials at the appropriate time. This will ensure that delicate materials will not be wasted. When the management schedule is in connection with the design of the architecture, it is difficult to misuse the resources since every resource is delivered at the right time.

It is very crucial for the company to set aside large amounts of funds to ensure the smooth running of the project without hiccups. Insufficient funds will result in slowing down of the process of project implementation and also lead to incomplete implementation of the project. The project will also have to borrow the same amount of money from the bank for security purposes so that the project runs without hitches (Charvat, 2003). This money will assist the Philharmonic Hall project to have sufficient funds that will not interfere with the production process. Even though the project is part of my work, am really hoping for it to succeed so that I can be present when it is officially opened.

Rooms in the building might have increased in heat from many sources such as solar radiation, people, lights, and equipment. This makes people uncomfortable due to an increase in temperature and humidity. Therefore the project needs to install an air conditioning system to ensure comfortable conditions. Air conditioning should be installed within the Liverpool Philharmonic spaces such as the auditorium.&nbsp.Air-conditioning is necessary for this building for the purpose of regulating heat. However, air-conditioning is expensive and should be avoided through other alternatives such as natural ventilation, higher ceiling, and open windows. Therefore a comparison will be made for the most appropriate air conditioning system.

Show more
LEARN MORE EFFECTIVELY AND GET BETTER GRADES!
Ask a Question