Write 5 pages thesis on the topic redevelopment of brownfield properties. From the EPA records, the sites are ready for redevelopment. The redevelopment project that will be highlighted in this paper

Write 5 pages thesis on the topic redevelopment of brownfield properties. From the EPA records, the sites are ready for redevelopment. The redevelopment project that will be highlighted in this paper is the transformation of the three sites into high school soccer fields. The redevelopment projects seek to identify synergies that may yield multiple benefits of preserving the environment as well as proving the properties useful.

In order to redevelop a brownfield into a football or soccer field, it is critical to consider some factors. The shape of the land and acreage is of critical consideration as it determines whether the cleaned-up brownfield can surface for the intended field. A football field needs a Brownfield that has exhibited a desirable shape, making it fit for this project. A soccer field categorized as small, acreage of 1-2 is required. It is important to consider the available total acreage of the brownfield, as other amenities such as parking, washrooms, spectator areas, bleachers, storage facilities, surface drainage features, bad spot ad buffer zones. For a high school case, a soccer field may require about 1.8 acres of land with the field being 110 yards in length, 80 yards in width, and 8 yards of goal width. These factors should be the preliminary determinants of whether a brownfield can be redeveloped into a soccer field (De, 2008).

The EPA carried out an assessment on this property in 1997 and established that the&nbsp.site needed clean up. The site was divided into three parcels of land, and the researchers considered each parcel separately. The acquisition of two of the parcels by interested parties left only one of the parcels requiring clean up in 2003. According to the EPA websites, a process of excavation of the site served to clear the parcel of the contaminants. Completion of the cleanup exercise left the third parcel of land ready for redevelopment. The cleaned-up site is 3.97 acres, an acreage fit for a small high school soccer field. Evidently, Alden corrugated that cleaned up acreage allows for the construction of a high school field (De, 2008).&nbsp.