Waiting for answer This question has not been answered yet. You can hire a professional tutor to get the answer.
Write 8 page essay on the topic Measured Building Survey.It comments on the current state of all parts of the structure. These parts of the building are physically inspected but limited to the scope o
Write 8 page essay on the topic Measured Building Survey.
It comments on the current state of all parts of the structure. These parts of the building are physically inspected but limited to the scope of services offered by the building surveyor. Major defects survey is also referred to as main elements survey. For this type of survey, focus is on the main parts of the structure. Inspection and report concentrate on selected areas like roofs, floors, ceilings and windows. The home buyer report survey is standardized, covering main aspects of the structure but not detailed. It is restricted only to accessible parts of the structure. Specific survey narrows down the scope of survey to particular parts of a property depending on the owner’s knowledge (Douglas, and Noy, 2011 P.8). In most cases, building survey is advocated for buildings that lack documentation or they cannot be used. However, it assists in developing reliable and an accurate document and or a verification of an existing document. This makes building survey an essential activity in the planning process as well as providing detailed information for further planning activities. The methods of survey used are: field sketch, dimensioned sketch, tape and offset survey or extended baseline survey and plane table and alidade survey. The best survey is achieved through a combination of these three methods (Scotland’s Rural Past, 2005, p.6). Sketches, plans and accurate geometric data together with information gathered from survey are combined and structured properly. These parameters are used to derive an actual design and planning process. The first step towards building survey is taking of measurements on site by use of conventional equipment like measuring stick or optical distance meters. Sophisticated surveying techniques like tachometry, laser scanner and photogrammetry are used (.Douglas, and Noy 2011, p.34). The next steps involve combining the measurements to produce details, sections and elevation of the property that are derived from plan. According to RICS (2007, p.30), any residential property is defined by linear measurement but not from floor area. Measurements are taken from a point not greater than 1.5 meters above the floor and skirting board. Recesses, bays and the like are excluded in the measurements taken. The room area should include kitchen units, cupboards and the like although it must be identified separately. When taking garage measurements, the span between main walls faces internally are of importance. Risk Assessment Some of the factors to consider in risk assessment are: Critical areas of concern in relation to residential property. Considerations from building codes and seismic zones. How to get information in relation to resources, skills and ability to investigate what you are not familiar with. Commitment to the task of checking and confirming details in the design. From the plan, elevations and sections developed from survey, the form, dimensions, orientation, natural lighting, ventilation and spatial organizations of occupants assist in redesigning a new property. Issues required in designing of a house and their relevance as well as recommendations is considered. This is what is called risk assessment that aims at construction of safer homes. The main risks for property are. fire, harsh environment, floods, cyclones and earthquakes. The main services are drainage, gas, electricity and water.