You are considering a small scale 25 MW community based Rankine cycle power system fueled with switchgrass.

You are considering a small scale 25 MW community based Rankine cycle power system fueled with switchgrass. The power plant is expected to be 20% efficient and the switchgrass fuel is expected to cost $50 per ton. Estimate the cost of electricity from this plant ($/kWh).