You are estimating the manufacturing hours for an airframe based on the airframe weight. The airframe you are estimating weighs 150,000 pounds.

You are estimating the manufacturing  hours for an airframe based on the airframe weight. The airframe you are estimating weighs 150,000 pounds. Given the following equation, select the correct response from each pair.

Hours = 124.50 = 0.75(Weight in pounds)

The slope is 0.75

The independent variable is Hours

The slope is 124.50

The estimated manufacturing hours for your airframe are 112,624.50 hours

The independent variable is Weight

The estimated manufacturing hours for your airframe are 112, 500 hours