Answered You can hire a professional tutor to get the answer.
A continuous flow cell is to be formed from final Assembly and Testing stations. The demand is 9000 units per month (5000 units of model X and 4000...
Batch size = 50 sec
Assume:
A) The testing machine has level 2 Automation.
B) The testing machine has level 3 automation.
1- Can the Machine(s) meet the Takt?
2- Identify how many operators you suggest to use in the continuous flow cell?
3- How do you suggest the work is distributed among them?
4- How would you physically organize these processes (draw a diagram)?
5- what improvements should be made to the current process to setup a continuous flow cell.