Assignment 2. Define Scope with a Work Breakdown Structure In the previous module, you began to plan for scope by developing a Project Charter and a...
Assignment 2.1: Define Scope with a Work Breakdown StructureIn the previous module, you began to plan for scope by developing a Project Charter and a Project Scope Statement. Now you will continue with Scope Planning by developing a work breakdown structure (WBS). Procedure1.Review the results from the previous application (the Project Charter and the Project Scope Statement).2.Create a work breakdown structure for the project, using these criteria: ◾It must be easy to interpret, such as a hierarchical list and/or a flow chart.•It must be possible for your instructor and other classmates to view it.
Running head: WBS 1 Assignment 2.1: Defining Scope with a Work Breakdown StructureNameInstitution WBS 2 Defining Scope with a Work Breakdown Structure for Harbor CompanyThe purpose of the...