BUS 515 FINAL EXAM PART 2 (THREE VERSIONS) 75 QUESTIONS

Question 1

_____________________ can perform a number of tasks to help a company focus on its core capabilities.

A plant within a plant

Agile manufacturing

Total Quality Management

Just-In-Time

Subcontractor networks

Question 2

_____________________ facilities may not be the best approach in today’s business environment that has short product and technological life cycles and in which flexibility is more important than ever before.

Large

Small

Leased

Self-operating

Agile

Question 3

The center of gravity approach

identifies the precise location for the new distribution site

identifies where the trucking firm should be located

may identify a location that may not be feasible to locate to

relies on GPS coordinates for all calculations

relies on which transportation method is selected

Question 4

What is the amount by which the efficiency of a production line falls short of 100%?

balance delay

efficiency deficiency

efficiency delay

balance shortfall 

percentage deficiency

Question 5

Which of the following is more like a product layout as compared to a process layout?

Resources used are specialized.

Facilities are less capital intensive.

Processing rates are slower.

Space requirements for inventory storage are higher.

Scheduling resources is more challenging.

Question 6

Which of the following is more like a product layout as compared to a process layout?

Resources used are general purpose.

Facilities are less capital intensive.

Processing rates are slower.

Space requirements for inventory storage are lower.

Scheduling resources is more challenging.

Question 7

Establishing a performance factor is an attempt to: 

fudge the actual times.

punish the worker who does not perform fast enough.

counterbalance any unusual patterns noted.

allow management to ‘encourage’ greater productivity.

use the ISO 9000 approval process.

Question 8

Typically the job chosen for the time study will be ___________________.

a routine job that is labor intensive

a simple job performed by many different people

done primarily by machine

done only occasionally

insignificant

Question 9

Which of the following most closely describes job enrichment?

vertical expansion

transferring workers through a series of jobs to increase their scope of experience

increasing the amount of workspace assigned to a worker

horizontal expansion

assigning two jobs to the same worker

Question 10

The ranking in ABC inventory analysis is based on what?

annual dollar usage

annual demand in units

alphabetical order

unit price

item number

Question 11

Which of the following inventory functions does not involve end products sold to customers?

anticipation inventory

fluctuation inventory

lot-size inventory

MRO inventory

speculative inventory

Question 12

Percentage of Line Items Shipped on Schedule recognizes that:

not all orders are equal but fails to take into account the dollar value of orders.

not all orders are equal but this can be compensated for.

there are differences in orders in terms of both line items and dollar value.

an absolute measure of manufacturing or service time lost because material or parts are not available.

all orders and customers should be treated equally.

Question 13

Which of the following is not an input to the aggregate planning process?

beginning workforce

demand forecast

beginning inventory

master production schedule

overtime available per period

Question 14

The aggregate plan helps manufacturing with all of the following except:

whom to employ 

how much work to subcontract

how much inventory can be held

when to add/subtract employees

when to use overtime

Question 15

Evaluating an aggregate plan in terms of number of back orders is using what perspective?

cost

customer service

quality

operations

human resources

Question 16

What does ERP stand for?

educational resources planning

end routing procedure

enterprise reliability production

enterprise resource planning

easy resource planning

Question 17

Which of the following does not share a common ERP database?

internal to the organization

suppliers

customers

the supply chain

CEO strategic plan

Question 18

The lead time can be less than the cumulative lead time when _________________________.

the company has inventory on hand

the order has already been shipped

the supply chain is well tuned

there is no safety time

the order is expedited

Question 19

What is a process batch?

the quantity of finished goods that can be sold

the quantity of items moved at the same time from one resource to the next

the quantity of work-in-process inventory

the quantity produced at a resource before the resource is switched over to produce another product

the set of machines used to make products

Question 20

What does “negative lateness” mean?

The job is finished after its due date.

The job is finished on its due date.

The job is finished before its due date.

The job is not finished.

The job has not started.

Question 21

Which of the following scheduling rules minimizes mean job flow time?

first come, first served

last come, first served

earliest due date

shortest processing time

longest processing time

Question 22

When we are unsure about the duration of project activities, we use _____________________ time estimates.

variable

probabilistic

estimated

deterministic

cumulative

Question 23

Which of the following is not an example of a method that can be used to reduce the time to complete an activity?

work on other activities

faster shipments of materials

use special equipment

work overtime

work around the clock

Question 24

Removing safety time from the individual activities and putting the total safety time at the end of the critical path creates a(n) ___________________.

project safety net

project buffer

overconfident project manager

activity shortage

larger number of activities

Question 25

What can be used to display graphically the scheduled times for activities?

an AOA network diagram

an AON network diagram

a project structure tree

a Gantt chart

an affinity diagram

VERSION 2

Chapter 11

Multiple Choice Question 43

For each work element in the time study, multiplying the mean observed time by the performance rating factor by the frequency of occurrence results in what?

the normal time for the element

the average observed time for the element

the standard time for the element

the average delay for the element

the standard time for the job

Multiple Choice Question 21

The approach that details the tasks of a job and how to do them is ____________________.

work measurement

job evaluation

methods analysis

job design

work sampling

Multiple Choice Question 64

Disadvantages of individual incentive systems include all except which of the following?

They undermine teamwork.

A study has shown they had no effect on worker performance.

They avoid the “free-rider” problem.

They need a significant amount of data collection.

They give employees a short-term focus.

Multiple Choice Question 3

Job design ensures that each employee’s _________ and ________ are geared towards achieving the company’s mission.

compensation, teams 

duties, teams

satisfaction, compensation

duties, responsibility

compensation, responsibility

Chapter 12

Multiple Choice Question 17

Companies can achieve cost-efficient operations by using which of the following inventory approaches?

work-in-process to buffer operations

inventory building to leverage reduced setup costs

JIT inventory to reduce overall cost

level work force maintenance through

speculative selling

Multiple Choice Question 27

Which of the following is an assumption of the basic EOQ model?

Lead time is known and constant.

Demand may be seasonal.

Orders can arrive in partial shipments.

Quantity discounts are considered.

Lost sales are allowed, but not back orders.

Multiple Choice Question 5

Which inventory function specifically is designed to allow the company to maintain a level production strategy?

anticipation inventory

fluctuation inventory

lot-size inventory

transportation inventory

speculative inventory

Multiple Choice Question 20

Which of the following is not affected by decisions about how much inventory to hold?

item costs

holding costs

depreciation

ordering costs

stockout costs

Chapter 13

Multiple Choice Question 16

What type of aggregate plan sets labor and equipment capacity to satisfy demand each period?

uniform

level

chase

mixed

steady

Multiple Choice Question 32

The comparison of aggregate plans is difficult when they produce different quantities and thus _________.

have different ending inventories

have different staffing levels

have different amounts of overtime

have different amounts of subcontracting

have different revenues

Multiple Choice Question 38

Once you implement a new aggregate plan you must then:

begin the planning process again.

evaluate the plan’s performance in terms of cost.

evaluate the plan’s performance in terms of customer service.

evaluate the plan’s performance in terms of human resources.

evaluate the plan’s performance in terms of cost and human resources.

Multiple Choice Question 53

The master production schedule is shared:

only internally.

only with management.

only to marketing and engineering.

to all members of the executive team, exclusively.

to all members of the supply chain.

Chapter 14

Multiple Choice Question 34

Information in the inventory records file that can change with inventory transactions includes the ________.

part number

lot size rule

projected inventory level

lead time

safety stock requirement

Multiple Choice Question 31

The quantity of the replenishment order is based on the __________________________.

capacity available

size of the item

number of workers available

inventory space available

lot sizing rule used

Multiple Choice Question 58

An action notice is generated ________________________________________.

for planned orders in any period

only for orders that are to be released to the shop floor

only for movements to and from the warehouse

only when marketing needs to be notified

when a planned order needs to be released

Multiple Choice Question 12

ERP systems provide _____ and _____ benefits.

tangible, HR

intangible, marketing

marketing, operation

tangible, intangible

CEO, CFO

Chapter 15

Multiple Choice Question 3

Scheduling in the high-volume environment is typically done through what?

priority rules

line design and balancing

Thompson’s rule

Simpson’s rule

Johnson’s rule

Multiple Choice Question 65

The process batch should:

match the transfer batch.

exceed the transfer batch.

be smaller than the transfer batch.

be fixed.

be variable.

Multiple Choice Question 16

If the schedule shows a 5 day slack between the end of Task A and start of Task B, this means:

You must start Task B as soon as Task A ends.

Task B start is late.

Task A is taking longer to complete.

Task A and Task B should be performed concurrently.

Task B start can be delayed up to 5 days after Task A’s scheduled completion.

Multiple Choice Question 12

Which of the following scheduling techniques determines the earliest possible completion time for a job?

finite loading

infinite loading

forward scheduling

backward scheduling

input/output control

Chapter 16

Multiple Choice Question 27

In making a forward pass through a network, three activities are immediate predecessors for activity T. What is the early start time for activity T?

the smallest ES for the three activities that are immediate predecessors for activity T

the largest ES for the three activities that are immediate predecessors for activity T

the smallest EF for the three activities that are immediate predecessors for activity T

the largest EF for the three activities that are immediate predecessors for activity T

the activity time for activity T

Multiple Choice Question 67

One way of wasting safety time in the critical chain approach is multitasking, which involves ___________.

waiting until the last minute to start a project

interaction among project activities

having the computer operating system do everything

using a person or resource for more than one project

reversing the order of the activities

Multiple Choice Question 8

Which phase in the project life cycle involves analyzing the project risk?

conception

feasibility analysis or study

planning

execution

termination

Multiple Choice Question 18

The critical path is the sequential path of interrelated activities which has the _______________.

most activities

longest time

most nodes

most events

most arrows

Multiple Choice Question 71

PERT is credited with reducing the duration of the Polaris missile project by ______________.

one year

two years

three years

four years

five years

VERSION 3

Multiple Choice Question 27

The ____________ time is the time it should take a qualified operator, working at a sustainable pace and using the appropriate tools and process, to do the job.

performance

observed

normal

standard

ideal

Multiple Choice Question 63

Profit sharing and gain sharing are two methods of _______________.

group incentive plans

keeping costs down

calculating pay for top management

employee retirement plans

keeping expense account costs under control

Multiple Choice Question 36

The formula for determining the number of observations needed depends upon all except which of the following values?

the number of standard deviations needed for the desired confidence

the maximum observed value in the sample

the standard deviation of the sample observations

the mean of the sample observations

the desired accuracy

Multiple Choice Question 67

Which one of the following would learning curves affect the most?

layout analysis

statistical process control

planning labor requirements

location analysis

robots

Multiple Choice Question 68

What is the formula for calculating the maximum inventory level?

Imax = H(1-d/p)

Imax = Q(1-d/p)

Imin = Q(1-s/p)

Imax = Q(1-d/s)

Imin = Q(1-d/h)

Multiple Choice Question 2

What are purchased items or extracted materials that will be transformed into components or products called?

raw materials inventory

finished goods inventory

work-in-process inventory

distribution inventory

MRO inventory

Multiple Choice Question 11

Which inventory function exists between the manufacturing plant and the distribution plant?

anticipation inventory

fluctuation inventory

lot-size inventory

transportation inventory

speculative inventory

Multiple Choice Question 41

If the costs (S and H) and demands (D) are the same, which of the following is not true with regard to the EPQ model as compared to the EOQ model?

The EPQ model produces a lower total annual cost.

The maximum inventory level is lower under the EPQ model than under the EOQ model.

The two models use different formulas to compute annual ordering cost.

The inventory depletion rate is the same for both models.

The two models use different formulas to compute annual holding cost.

Multiple Choice Question 42

When a company’s product is nontangible (a service), which of the following is no longer a viable option?

hiring permanent employees

subcontracting

inventory

working overtime

increasing normal capacity

Multiple Choice Question 41

A demand-based option in which the operations department uses inventories and back orders to react to demand fluctuations is called

hyperactive

inactive

proactive

reactive

retroactive

Multiple Choice Question 9

The next level down in the planning process after development of the aggregate plan is the _____________.

materials requirements plan

engineering plan

rough-cut capacity plan

master production schedule

purchasing plan

Multiple Choice Question 18

What type of aggregate plan keeps a stable workforce and uses backorders to compensate for excess demand needs?

uniform

level

chase

hybrid

steady

Multiple Choice Question 74

Which of the following does not share a common ERP database?

internal to the organization

suppliers

customers

the supply chain

CEO strategic plan

Multiple Choice Question 18

Independent demand is the demand for ______________.

finished products

subassemblies

parts

raw materials

components

Multiple Choice Question 60

Which of the following is not a lot size rule?

lot for lot

fixed order quantity

overall factors

least total costs

parts period balancing

Multiple Choice Question 34

Information in the inventory records file that can change with inventory transactions includes the ________.

part number

lot size rule

projected inventory level

lead time

safety stock requirement

Multiple Choice Question 38

What does average number of jobs in the system measure?

WIP inventory

due-date performance

makespan

job tardiness

job lateness

Multiple Choice Question 47

Which of the following is a measure of how long after the due date the job is completed?

job belatedness

mean flow time

makespan

job overdueness

job tardiness

Multiple Choice Question 73

When were Gantt charts developed?

early 1800s

early 1900s

early 1920s

early 1940s

early 1960s

Multiple Choice Question 13

Which of the following is most likely the reason you may have to wait at the doctor’s office?

infinite loading

finite loading

forward scheduling

backward scheduling

none of these answer choices are correct

Multiple Choice Question 45

What can be used to display graphically the scheduled times for activities?

an AOA network diagram

an AON network diagram

a project structure tree

a Gantt chart

an affinity diagram

Multiple Choice Question 10

Which phase in the project life cycle involves ending the project?

conception

feasibility analysis or study

planning

execution

termination

Multiple Choice Question 24

The process of calculating ES and EF ______________________________.

requires only a forward pass through the network

requires only a backward pass through the network

requires both a forward and backward pass through the network 

cannot be accomplished until slack is first determined

is sufficient for calculating the critical path

Multiple Choice Question 50

Which functional group is not concerned with project management outcomes?

Marketing

Operations

Purchasing

Administration

Information Systems

Multiple Choice Question 38

Which of the following can be calculated for an activity once ES, EF, LS, and LF have been calculated for the activity?

expected project duration 

slack time

potential for crashing

variance in project duration

the relative time position for when the activity will be completed

Show more
  • @
  • 177 orders completed
ANSWER

Tutor has posted answer for $35.00. See answer's preview

$35.00

******** **

********************* *** perform a ****** of ***** to **** a ******* focus ** its **** *************

* ***** within * ******

***** **************

Total ******* ***********

*************

************* *********

Question **

********************* ********** *** not ** *** best ******** in today’s ******** *********** **** *** ***** ******* and technological life ****** *** ** ***** *********** ** **** ********* than **** *******

Large

******

*******

Self-operating

Agile

Question **

*** ****** of gravity approach

********** *** ******* ******** *** the *** ************ *****

********** where *** ******** **** ****** be ********

*** identify * ******** **** may *** ** ******** ** locate ***

****** ** GPS coordinates *** all *************

relies ** which ************** ****** ** *********

******** **

**** is *** ****** ** ***** the efficiency of a ********** **** ***** short of 100%?

******* ******

********** ***********

efficiency ******

******* **********

percentage ***********

******** 5

***** of the ********* is **** **** a ******* ****** as compared ** * ******* layout?

********* used *** ************

********** *** less ******* **********

********** rates *** *******

***** ************ for ********* ******* *** *******

********** ********* is more challenging

******** **

***** of *** ********* ** **** **** * ******* ****** ** ******** to * ******* ********

********* **** *** general ********

Facilities are **** ******* intensive

********** ***** *** slower

***** ************ *** ********* ******* *** ******

********** ********* ** **** ************

Question **

************ a *********** ****** ** ** ******* to:

fudge the actual ******

****** *** ****** *** **** not perform **** *******

counterbalance any ******* patterns ******

***** ********** ** *********************** greater *************

*** *** *** 9000 ******** ********

******** **

********* *** *** ****** *** *** **** ***** **** ** ********************

a ******* job that ** labor **********

a ****** *** performed ** **** ********* *******

**** primarily by ********

**** only *************

insignificant

******** **

***** ** *** ********* **** ******* ********* *** enrichment?

******** **********

transferring workers through a series ** jobs ** ******** ***** scope ** ***********

********** the ****** of ********* ******** to * *******

********** **********

********* *** jobs ** *** same worker

Question 10

*** ranking ** *** ********* ******** ** ***** ** ******

annual ****** ******

****** ****** ** ******

************ ******

**** ******

item number

******** 11

Which of *** ********* ********* functions does not ******* *** products sold ** ***********

************ inventory

fluctuation **********

******** **********

*** inventory

*********** **********

******** 12

********** ** **** ***** ******* ** Schedule recognizes ******

*** all ****** are ***** *** ***** ** **** **** account the ****** ***** ** *******

*** *** orders are ***** but **** can ** *********** ****

there *** *********** ** orders ** terms of both **** items and dollar ******

an ******** ******* ** manufacturing or ******* **** **** ******* ******** ** ***** *** *** **********

*** ****** and customers ****** be ******* ********

******** ***

***** ** *** following is not ** ***** ** *** ********* planning process?

********* workforce

****** *********

********* **********

****** ********** *********

overtime available per period

******** ***

*** ********* **** helps ************* **** all of *** ********* ********

**** ** *******

how much **** ** ************

*** **** ********* *** ** *****

**** to ************ **********

when ** *** *********

******** ***

Evaluating an ********* **** ** ***** ** ****** ** **** orders is ***** **** *************

*****

******** ********

quality

***********

***** **********

******** 16

**** **** *** ***** *****

educational ********* *********

*** ******* **********

********** reliability ***********

********** ******** *********

**** ******** planning

Question 17

***** ** *** ********* **** not ***** * ****** ERP **********

******** ** *** *************

**********

**********

the ****** ******

*** strategic plan

******** ***

The **** time *** be **** than *** ********** **** **** **** **************************

*** company *** ********* ** *****

the ***** has ******* **** ********

*** ****** ***** ** **** ******

***** ** ** safety *****

*** ***** ** expedited

******** 19

**** ** * ******* *******

the ******** ** ******** goods **** can be *****

*** ******** ** items ***** ** *** **** **** from *** ******** ** *** next

*** ******** ** work-in-process inventory

*** ******** ******** ** * ******** ****** *** resource ** switched **** to produce another product

*** *** of ******** **** to **** *********

Question 20

**** **** “negative *************** ******

The *** is finished ***** *** *** *****

*** *** ** finished ** *** due *****

*** job ** finished ****** its *** date

*** *** ** *** *********

*** *** has *** ********

******** ***

***** of *** ********* ********** ***** ********* **** *** **** time?

***** come first *******

**** come ***** *******

earliest *** *****

******** ********** *****

longest ********** *****

Question ***

**** ** *** ****** ***** the duration ** ******* activities ** *** ********************* time estimates

*********

**************

**********

**************

***********

********

23 Which

** *** ********* is *** ** ******* ** * ****** **** *** ** **** to reduce the time to ******** an ********** ****

on other *********** ******

********* of ********** ***

******* ********** ****

********* work

****** *** ****** Question

*** ********

****** **** **** *** ********** activities *** putting the total safety **** ** *** *** of *** ******** **** ******* **** ******************** *******

****** **** *******

******* *************

******* manager ********

********* ******

****** ** *********** ********

*** ****

can ** **** ** display graphically the scheduled ***** *** ************ an

AOA ******* ******** **

*** ******* ******** *

******* ********* ***** *

***** ****** **

affinity diagram *******

**

******* 11

******** ******

******** *** *** ****

**** ******* ** *** **** study *********** *** mean ******** **** ** *** *********** ****** ****** by *** frequency of ********** ******* in what? *** ******

**** *** *** ******** *** average

******** **** *** *** ******** *** ********

time *** *** ******** *** *******

delay *** *** element the standard

**** *** *** **** ******** ******

******** 21 The ********

**** ******* *** ***** of * *** *** how ** do **** is ____________________ work ************

*** ***********

******* *********

*** *******

work sampling

******** ******

******** *** ************* **

individual incentive ******* ******* *** ****** which ** *** following? They undermine

********* * *****

*** shown **** *** ** ****** ** ****** ************ They *****

*** ************************ ******** They ****

a *********** amount ** data *********** **** give

********* a ********** focus ******** ******

******** ** *** design

ensures **** **** **************** _________ *** ******** *** ****** ******* ********* the *************** mission compensation teams

duties ******

************ compensation

duties ***************

compensation ***************

******* ***

******** Choice

Question *** Companies can

******* ************** ********** ** ***** ***** ** *** ********* ********* ************ *************** **

****** *********** inventory building

** ******** ******* ***** ****** JIT *********

to ****** ******* ***** ***** work

***** maintenance through speculative ********

******** ******

******** *** ***** **

*** ********* is ** assumption of *** ***** *** ******* **** ****

** ***** *** ********* ****** ***

** ********* ****** ***

arrive ** ******* ********** ******** discounts

are *********** Lost *****

*** ******* *** not **** ******* ******** Choice

******** ** ***** inventory

******** specifically is designed to allow the company ** maintain a ***** ********** ********** ************ **********

fluctuation **********

******** **********

************** **********

*********** inventory

Multiple Choice

******** *** Which of

the ********* is *** ******** by decisions ***** *** much ********* ** ****** **** costs

******* costs

************* ********

******

******** costs

******* ***

Multiple Choice

Question *** What ****

of ********* **** sets labor *** equipment ******** to satisfy ****** **** ******** ******** ******

******

******

*******

********

******

******** *** The **********

** ********* ***** ** ********* **** **** produce ********* ********** and **** _________ **** *********

ending inventories have *********

******** ******* **** different

amounts ** ********* **** *********

******* ** subcontracting have *********

********* ******** ******

******** *** **** ***

implement * new ********* **** *** **** ****** begin ***

******** process ****** ******** ***

************ *********** in ***** of ***** evaluate ***

************ *********** in ***** ** customer service evaluate ***

************ *********** in ***** ** ***** ********** ******** the

plan’s *********** in ***** ** cost *** ***** ********** ******** Choice

******** *** The master

production ******** ** shared: **** ***********

**** ****

*********** only **

marketing and ************ to all

******* ** *** ********* **** ************ ** all

members ** *** ****** chain ******* 14

Multiple ******

******** *** Information **

*** ********* records file that *** change **** ********* ************ ******** *** ********* part *******

lot ****

***** projected *********

level lead *****

****** *****

************ ******** ******

******** 31 *** ********

of the ************* ***** ** based ** *** *************************** ******** **********

size **

*** ***** ****** of

workers available ********* *****

available *** sizing

rule ***** ******** ******

******** 58 ** ******

notice is generated ***************************************** *** *******

****** ** *** ******* **** ***

****** that *** ** ** ******** ** *** **** ****** **** ***

movements ** *** **** the warehouse **** ****

********* needs ** ** ********* **** a

planned order ***** ** ** ********* ******** Choice

******** *** *** *******

******* ***** *** ***** benefits ******** ***

********** marketing

********* **********

******** ***********

CEO ****

******* ***

******** ******

Question ** ********** in

*** *********** *********** ** typically **** ******* what? ******** ******

line ******

and ********** **************** *****

*************** rule

*************** *****

******** Choice

******** 65 *** *******

***** ******** ***** ***

transfer ****** exceed ***

transfer ****** be smaller

than *** ******** ****** ** ******

be *********

******** ******

******** *** If ***

******** ***** * * day ***** between *** *** ** Task * *** ***** ** Task * **** ******* *** must

***** Task * ** **** ** **** * ***** Task B

***** ** late **** *

** taking longer ** ********* **** *

*** **** * ****** ** ********* ************* Task *

***** can ** delayed ** ** * days ***** Task A’s ********* *********** ******** ******

Question 12 Which of

*** following ********** techniques ********** *** ******** ******** ********** **** *** a ***** ****** ********

infinite loading

******* ***********

backward ***********

************ control

******* ***

******** Choice

******** *** ** ******

* ******* **** ******* * ******* ***** activities *** ********* ************ *** activity * What ** *** ***** start time *** ******** *** the ********

ES for *** ***** ********** **** *** immediate ************ *** activity ** *** *******

** *** *** three ********** that are ********* ************ *** ******** T *** smallest

** for *** three activities that are ********* predecessors *** ******** T the *******

** *** *** three ********** **** *** ********* ************ *** activity ** *** activity

**** for ******** ** Multiple Choice

Question *** *** ***

** wasting ****** **** in *** ******** ***** ******** is ************ ***** involves ************ ******* until

the last ****** ** ***** * project *********** *****

******* *********** having the

******** ********* ****** do *********** using *

****** ** ******** *** more than *** ******** ********* ***

***** ** *** activities ******** ******

******** 8 Which phase

** the ******* life ***** ******** analyzing *** ******* ****** conception feasibility

********

** ****** ********* **********

************

********

Choice

******** *** *** critical

**** ** the sequential path of ************ activities which *** *** _______________ **** ***********

longest *****

**** ******

**** *******

**** *******

******** Choice

******** *** **** **

credited **** reducing *** duration ** *** ******* ******* ******* by ______________ *** *****

two ******

***** ******

**** ******

**** ******

VERSION **

********

Choice ********

*** The ____________ ****

** the **** ** ****** **** a ********* ******** ******* ** * sustainable **** *** ***** the appropriate tools *** ******* to ** *** job ************ ********* *******

*********

******

********

******

********

*** Profit sharing and

gain ******* *** *** ******* ** **************** ***** ********* ******

******* costs *****

*********** *** ***

top *********** ******** ********** ******

******* ******* *******

costs ***** ******** ******** ****** Question

36 *** ******* ***

*********** the ****** ** ************ needed ******* **** *** except ***** ** *** following values? the number **

******** ********** ****** *** *** ******* *********** *** maximum ********

***** in *** ******* the ******** deviation

of *** ****** observations the **** **

the ****** ************* *** ******* *********

******** ****** Question

*** ***** *** **

the ********* ***** learning curves affect *** ****** ****** analysis ***********

******* ********

planning ***** *************

******** analysis robots

Multiple ******

********

*** **** is ***

formula *** calculating the ******* inventory ******* Imax * *********

**** * *********

**** * *********

**** * *********

**** * *********

******** ****** ********

2 **** are *********

***** ** ********* materials **** **** ** *********** **** ********** ** ******** ******** *** ********* **********

******** ***** inventory

work-in-process ********** ************

********** ***

********** ********

Choice ********

11 ***** ********* ********

exists ******* the ************* ***** *** the ************ ******* ************ ********** ***********

********** ********

********** **************

********** ***********

inventory Multiple

****** ********

41 ** the costs

(S *** ** and demands (D) *** *** same which of the ********* is not true with regard ** *** *** model ** ******** ** *** EOQ model? *** EPQ *****

******** a lower ***** ****** ***** *** ******* *********

level is ***** ***** *** *** ***** **** under the *** ****** *** *** ******

*** different ******** ** ******* ****** ******** ***** The ********* depletion

**** ** *** same *** both ******* The *** ******

*** ********* formulas ** compute annual ******* ***** ******** ****** ********

42 **** a ***************

******* ** *********** ** ******** ***** ** the ********* is no ****** * viable option? ****** ********* employees

*************** ********** working

*********

**********

****** capacity

******** ****** Question

41 A demand-based ******

in ***** *** ********** department **** *********** and back ****** to ***** to ****** fluctuations is ******* ************ ********* **********

*********

************

********

******

Question

** *** **** *****

**** in *** ******** ******* after development of *** aggregate plan ** the ************** ********* requirements plan

engineering ***** *********

******** plan

master production *********

purchasing ***** ********

****** ********

*** **** **** **

********* **** ***** * stable workforce *** **** backorders ** ********** *** excess ****** ******* uniform level ******

hybrid

*******

********

******

********

74 ***** of ***

********* **** *** ***** * common *** ********** ******** ** ***

************* ********** ********** ***

******

******

*** strategic *****

******** ****** Question

*** *********** demand is

the ****** *** *************** ******** ********* **************

parts ***

**********

components

******** Choice

Question

60 Which ** ***

following is *** a *** **** ****** lot *** lot

fixed order *********

******* factors least

***** ******

***** ****** **********

******** ****** ********

*** *********** ** ***

inventory ******* **** that can ****** **** ********* ************ ******** *** ********* part ******* ***

size rule

********* inventory level

lead time ******

***** ************

Multiple ****** ********

38 **** **** average

****** ** **** in *** ****** ********* *** ********** ********

performance *********

*** tardiness

job

********* ********

****** Question

*** ***** of ***

********* ** * ******* of *** **** ***** *** due **** *** *** is *********** *** belatedness ****

**** *****

********* job overdueness

***

********** Multiple

Choice ********

*** When were *****

charts *********** ***** ****** *****

****** early

****** early

1940s *****

****** Multiple

Choice ********

*** ***** ** ***

********* ** **** ****** the ****** *** may **** ** **** ** *** ************** ******** infinite ******** ******

******** forward

scheduling ********

scheduling none

** these

****** ******* are correct ******** ****** ********

*** **** *** be

**** ** ******* *********** the ********* times for ************ ** AOA *******

diagram an *** *******

******** * ******* *********

***** * ***** ******

an affinity ********

Multiple Choice Question

10 ***** phase **

the ******* life ***** involves ending *** ********* *********** *********** ********

**

****** planning ********** ************

Multiple

Choice

********

24 *** ******* **

calculating ES and EF ******************************* requires **** a

******* **** ******* *** ******** requires **** *

******** pass ******* *** network requires **** a

******* *** ******** **** ******* the ******** cannot ** ************

***** ***** ** first *********** ** ********** for

calculating *** ******** ***** ******** ****** Question

*** ***** ********** group

** not ********* **** ******* management ********** Marketing Operations Purchasing

***************

***********

********

********

****** ********

38 Which ** the

following *** ** ********** *** ** ******** **** ES ** ** *** ** **** **** ********** *** *** ********** expected ******* *********

***** ***** potential

*** *********

variance ** project

duration *** ******** ****

******** for when *** ******** **** ** *********

Click here to download attached files: BUS 515 FINAL EXAM PART 2.docx