Waiting for answer This question has not been answered yet. You can hire a professional tutor to get the answer.

QUESTION

Construction Assignment.

CMGT 306-1: Construction Site Operations Spring 2017  Assignment No. 2 REVISED 2/17/17 Each student to develop a site logistics plan Include adjacent streets  Show building orientation on site  Prepare a project site layout and organizational plan (graphically and narratively)   At a minimum your plan should include: • A site logistics plan for the mobilization phase of the project (from mobilization through demolition). • A site logistics plan for the rough-in phase of the project. • A site logistics plan for the finishes phase of the project until substantial completion. At a minimum you should address: • Jobsite access to and from the worksite; for workers, occupants, public. • Temporary facilities; utilities, offices, storage, sanitary. • Materials handling; material movement, delivery, storage, and handling. • Security, safety, and signage; both inside and outside. • Communications to owner, occupants, public. • Work sequence, policies, and procedures  No presentations in class Since no presentations, provide a written narrative of the work sequence and complete explanation of the plan.  This narrative shall be as if you are presenting this to your client and explaining what your plan is and defending it. Any data not identified on the plan but included in your concept shall be defined in the narrative.

Show more
LEARN MORE EFFECTIVELY AND GET BETTER GRADES!
Ask a Question