CONTROL CHARTS
SHORT ANSWER, FILL IN THE BLANK, TRUE/FALSE.
Your heart has different pulse rates depending on what daily type activities you are involved in. Is that an example of random or assignable variation
1. Once you have constructed your x-bar and r-charts, which one should you look at first and why?
2. What measure is common to each of the formulas for the x-bar and r-charts?
3. On an R-chart, the line for the lower control limit is dotted if the subgroup size is ___7________ or
more.
What is used to estimate in the formula for X-bar charts
4. What is the primary advantage and disadvantage of using the s-chart?
5. True or False. A process can be in control and not be within specifications.
6. True or False. If your x-bar and r-charts are out of control, your capability calculations are
unreliable.
7. True or False. The Cpk value can be greater than the Cp value if the process is not centered
between the Upper Spec Limit and the Lower Spec Limit.
- @
- 11 orders completed
- ANSWER
-
Tutor has posted answer for $10.00. See answer's preview
***** ****** **** IN THE BLANK ************* **** *** * ***** ******* ** variation a) Treatment *** *** ** the ****** ***** studyb) ***** *** *** to ***** outside uncontrolled ********* *********** ***************** **** ***** *** ********* pulse rates ********* ** **** ***** type ********** *** *** ******** ** Is **** an example ** ****** ** ********** ************ **** *** it is a ****** ***** ** ********* **** ***** ** ****** *********** **** *** **** *********** **** ***** *** ******** ***** *** ****** *** **** ** first *** why? We **** ** *** ***** ***** ***** *** ******* ****** ** *** ***** ****** are ******* from *** ******* ***** ** ** the ***** ***** ** out of ******* then *** control ****** ** *** X-bar chart *** ************** **** measure ** ****** ** **** of *** ******** for the ***** *** **************** ** an ******* *** line *** *** ***** ******* ***** is ****** ** *** subgroup **** is ___7________ ormore 6 **** is **** to ******** ** the ******* for X-bar charts?It *** ** Estimated ** **** sp /c4) where sp ** * ****** ******** obtained ****** ****** * *** *********** *** ************* = **** of the *** subgroupni =the ****** of ************ ** ith ************ = constant that depend on n(from *** ***** ** control ***** ******** **** ** *** ******* ********* and ************ of ***** *** ************ Advantages ************ control ****** ***** monitor **** **** one quality ************** *************************** ******* charts **** **** **** *** **** *** ********** **** ******** ******* ********************************* control ****** need ****** sample **** **** ******** control ******************* information ***** not determine *** ****** ** ***** *** of control ** ********** ****** is meaningful 8 True ** ***** * ******* can ** ** control *** not ** ****** specifications TRUE 9 **** ** False If **** ***** and r-charts *** *** of ******* **** ********** ************ *** unreliable ******** **** ** ***** *** Cpk ***** *** ** ******* **** *** Cp ***** if *** ******* ** *** ******** ******* *** Upper Spec ***** *** *** Lower **** ***** ******