I need complete 1-2 pages paper on the following assignment. HALF PAGE LENGTH IS NOT ACCEPTED. Must address the all steps properly.  Must include 2-3 credible references and cited in APA.  Must provide 100% original work.

DO NOT PROVIDE THE PREVIOUSLY USED WORK.

DO NOT WRITE QUESTIONS IN ANSWER!

Assignment:

In this short paper, you will create an outline of your project management plan. (My organization is Tesla Inc. and I attached below the previous modules papers.)

Using the attached outline template, in a complete 1-2 page specifically, the following critical elements must be addressed:  

  • 1.       State your intentions for managing and balancing the scope-time-cost triangle.
  • 2.       Highlight the key risks and obstacles that management will have to mitigate for the plan.
  • 3.       Identify the triggers or signals that management will use to monitor if these risks are occurring or not.
  • 4.       Summarize the cost schedule by providing cost categories for the project—ROM dollar estimates are adequate for this. This can be done in a tabular format for clarity.

In your paper, must include 2-3 credible sources, cited in APA.