Answered You can buy a ready-made answer or pick a professional tutor to order an original one.

QUESTION

Efficiency of the Production Operation

Research the process of producing an expensive product (assume that it is something that must cost at least $1,000). After learning the steps that must be accomplished to produce such a product, address the following:

What would you expect the layout of a producing facility to look like (in other words, what is the process layout for such an operation)?

What would determine when someone had finished working on one of these products (in other words, how would someone know that it was time to work on producing the next unit)?

How would the efficiency of the production operation that you have envisioned be calculated (your answer should be specific to the type of product you selected, not just a general discussion of efficiency)?

From your research, are there any ways in which the production of the product could be made more efficient than the way that it is normally produced? If so, what recommendations could you make? If not, describe another way in which the product could be made, even if it was inefficient.

Show more
invader
invader
  • @
  • 1 order completed
ANSWER

Tutor has posted answer for $10.00. See answer's preview

$10.00

** ********* *********

**

**

**********

******* ***** to ********* * new ***** ** *** ** the ****** containing larger ***** *** comfort Besides this it **** ***** to offer the *** ** ** ********** ****** *********** **********

**

* ******* ******** *** expected outputs produced ****** *** ****** **** ***** of *** ******* *** *** given example ********** of *** ******* would ******* *** ********* outputs: ****** List **

**************

as *** *** *********** ** *** *** model ****** ************* ** **********

******

Testing of *********** •

Check

feasibility ** *** new

model

*** perform the ******* modifications ****** Final testing ****** Approval *** manufacturing

the

*** ****** **************

*****

*********** for *** ***** ******* ******* ***

following

************* • Production ****** Engineering ****** ******** *** ************ ****** Marketing

******** ***********

**

** **********

***********

****** ****** ** ********

**

keep *

*****

on *** ***********

of

********

**

would **** *** ************ to understand **** **** ** should ***** *** production ** **** ***** C ******* **** ** ** ******** document approved ** ********** **** ********** *** scope *********** **** ***

*********

**

a

******* ** **** ****** *** ****** ********* and ***** ******** *** proper ********* of *** ***** Hence ******* plan is ********* *** ********** accomplishment ** * ******** ***** and ******* ***** indicate ********** ******* in *** ***** ** * project ****** *** **** ***** *********** It

*****

*** ************ of ********** in ****** ******** of ******* Changes ** project ***** *** ****** *** *** ****** involved in *********** **** ***** ***** it ***** ****** in ****** *** ******** ******** ********** ************** of * ******* requires *** following ************ • ************* of ***** *** ************* ******* scope ****** ********* **

clear

and ******** business requirements • ************* ** ********* for

****

***** of *** development life ****** ****** ********

***

************ of sufficient ********** ****** ********* *** **********

********

during *** ******** ************ • ******* *** ****** *** *** ******** ***

bugs

****** ******* ****** ******** ** the *********

****

would ******** ***** *********** ***** ** *** ** concluded

****

***** ******** ** ********* *** proper ********* ** a

********

* ************* content sharing and project ******** ***** ********** *** ********* for

a

************* **** ********* ************* and content ******* ***** *** team ******* ** share ******** information ***

*****

****

****

**** ** create a ****** ************* ******* *** **** members ******* planning and ********** helps in equal distribution of ***** *** **************** between *** **** ******* Thus ** ***** **** in ********* ********** ** *** **** ** ******** *** ********* *** **************

***

***** factors are ******* ** ****** * ****** ************* ******* *** **** members **** ** these components holds * ******** ********** Besides these ******* ** ************ ****** ensure the ******* *** *****

*****

the **** members It ***** **** ** ******* * ****** ************* *** coordination between ****

Click here to download attached files: An expensive project.docx
or Buy custom answer
LEARN MORE EFFECTIVELY AND GET BETTER GRADES!
Ask a Question