Introduction to Project Risk Management

Overview:-

Risks fall in a few categories, known and unknown. It is extremely important in any project to effectively plan for both with a contingency budget and resources because some will happen. In this class, you are asked to develop a Risk Management Strategy and Plan that identifies potential risks, ranks them by impact and likeliness, contains mitigation strategies, and includes a way to control and communicate them. You will select a project that you may have developed in a previous class or a known project in your organization to create this strategy and plan for.

Throughout this course, you will be working on developing several components of a final Key Assignment. Additional information and the deliverables for each Individual Project will be provided in the assignment description for this project.

In this first Individual Project, you are asked to develop the outline of the sections that will be included in the “Risk Management Strategy and Plan” document and a draft of a proposal to submit to your instructor. The other information you will include is a high-level description of the project you will be conducting the risk analysis on.

You will also be setting up the final Key Assignment outline that you will add to each week. The combined Individual Project (IP) assignments will be your final Key Assignment deliverable.

Project Selection:

The first step will be to select a project that you to develop a risk management strategy and plan for. This project will be used as the basis for each of the assignments throughout the course and should conform to the following guidelines:

Nontrivial: The selected project candidate should reflect a real-life project that has at least the major milestones identified.

Domain Knowledge: You will be applying knowledge of this project to address assignments related to identifying and analyzing risks.

Select a project that fits these requirements

Assignment:

Your first task in this process will be to select a project to use as the basis of your Key Assignment. You will also create the shell document for the final project Key Assignment document deliverable that you will be working on throughout the course. As you proceed through each project phase, you will add content to each section of the final document to gradually complete the final project delivery, which is the Risk Management Strategy and Plan.

The following project deliverables:

Submit project proposal to instructor for approval

Risk Management Strategy and Plan Document Shell

Use Microsoft Word

Title Page

Course number and name

Project name

Student name

Date

Table of Contents

Use auto-generated TOC

Separate page

Maximum of three levels deep

Be sure to update the fields of the TOC so it is up-to-date before submitting your project.

Section Headings (create each heading on a new page with TBD as content except for sections listed under "New Content" below)

Project Outline

Risk Management Justification

Project Risks Identification

Project Risks Assessment

Project Risks Responses Strategy

Project Risks Responsibility Plan

Project Risks Monitoring & Control Plan

Project Risks WBS & Budget Updates

Project Risks Communications Plan

New Content to be Inserted in Above Shell

Project Outline

Brief description of the project.

The milestones and/or WBS for the project.

Material can be taken from approved proposal submitted to the instructor, and this will serve as the draft for the proposal.

Be sure this project is approved by the instructor.

Risk Management Justification

Discuss why risk management is so important to the success of the selected project in a letter to the project sponsor.

Describe the steps that will be used to develop the Risk Management Plan.

Represent this process in a flow diagram as well.

Project Risks Identification

Start brainstorming, at a high level, on some categories where risk could occur in this project (Note: you will continue this brainstorming activity in the next week with specifics, likelihood, and impact).

Assignment Objectives

Explain how risk management is integrated as a component into the total project management approach.

Show more
Elite2
Elite2
  • @
  • 331 orders completed
ANSWER

Tutor has posted answer for $40.00. See answer's preview

$40.00

*************** **** in * *** categories ***** and ******* ** ** ********* ********* ** *** project ** effectively plan *** both **** * *********** budget *** ********* ******* **** **** ****** ** **** ***** *** *** asked ** ******* * Risk ********** ******** *** Plan **** ********** potential risks ***** **** ** ****** *** ********** ******** ********** ********** and includes * *** ** ******* and communicate **** *** will ****** * project **** *** *** have ********* ** * previous ***** ** a ***** ******* in **** ************ ** ****** **** ******** *** **** forThroughout **** ****** you **** ** ******* ** ********** ******* ********** of a ***** Key ********** ********** *********** *** the ************ *** each ********** ******* will ** ******** ** *** ********** *********** *** **** ********* this first ********** Project you *** ***** ** ******* *** ******* ** *** ******** **** will be ******** in *** ******* ********** ******** *** Plan” ******** *** * ***** ** * proposal ** ****** ** your ********** The other *********** *** **** ******* ** a ********** *********** ** *** ******* *** **** be conducting *** **** ******** ***** **** **** be setting up *** final *** ********** ******* **** *** **** *** to **** week The ******** ********** Project **** *********** will be **** ***** *** ********** ****************** Selection:The ***** **** **** ** ** ****** * ******* **** you to develop * risk ********** ******** *** **** *** This ******* **** ** used ** *** basis *** each of *** assignments throughout the ****** *** ****** ******* ** *** ********* guidelines:Nontrivial: The ******** ******* candidate should reflect * real-life project that *** ** least *** ***** ********** **************** Knowledge: You **** ** applying ********* ** this ******* to address assignments ******* to identifying *** ********* risksSelect a project that **** ***** *************************** first **** ** **** process **** be ** ****** * ******* ** *** as *** ***** ** **** Key ********** You **** **** create the ***** ******** *** the ***** ******* Key ********** ******** deliverable **** *** will be ******* ** ********** *** course As *** ******* ******* **** ******* phase *** will *** content to each ******* ** the ***** ******** ** gradually ******** the ***** ******* ******** ***** ** *** **** ********** Strategy *** PlanThe ********* ******* ******************* ******* ******** ** ********** for ************ ********** ******** *** Plan Document ShellUse ********* ********* ********** ****** *** *********** *********** ************* ** ContentsUse ************** TOCSeparate *********** ** ***** ****** ****** **** to update *** ****** ** the *** so it ** ********** before ********** your projectSection Headings (create **** ******* ** * new **** with *** ** ******* except *** sections ****** ***** **** ******** ************* OutlineRisk ********** ******************** ***** IdentificationProject Risks ***************** ***** ********* StrategyProject ***** ************** PlanProject Risks ********** & ******* PlanProject ***** WBS ***** Budget ************** Risks Communications PlanNew ******* ** ** ******** ** ***** ************ OutlineBrief *********** ** *** projectThe ********** ****** *** for *** projectMaterial can be ***** **** ******** ******** submitted ** *** ********** *** **** **** ***** ** *** ***** *** *** ********** **** **** ******* ** ******** ** *** ************** ********** ******************** why **** ********** is so important ** *** ******* ** *** ******** ******* ** a ****** ** *** ******* *************** *** steps that **** be **** ** ******* the Risk Management PlanRepresent **** ******* ** a **** diagram ** wellProject ***** ******************* brainstorming at * **** ***** ** **** ********** ***** **** ***** ***** ** **** ******* (Note: *** **** continue this ************* ******** in *** **** **** with ********* ********** and ***************** ***************** *** risk ********** is ********** ** * ********* into *** ***** ******* management ********

Click here to download attached files: 338087_91373_1_TM_C_Risk-management-strategy.docx
or Buy custom answer
LEARN MORE EFFECTIVELY AND GET BETTER GRADES!
Ask a Question