Answered You can hire a professional tutor to get the answer.

QUESTION

Need an argumentative essay on Architecture & Construction. Project evaluation & Design. Initial proposals, Design Briefs and Feasibility studies. Needs to be 5 pages. Please no plagiarism.The develop

Need an argumentative essay on Architecture & Construction. Project evaluation & Design. Initial proposals, Design Briefs and Feasibility studies. Needs to be 5 pages. Please no plagiarism.

The development will be an apartment that will have its own uninterrupted ocean views with access to the site. Each apartment will have 3 bedrooms, all with ensuites, a study, a theatre room, large open living with plenty of room for dining and also 2 spacious balconies. The main balcony will be facing northeast, and the second balcony will be northwest and will accessible via the main and second bedroom. There will be floor to ceiling glass slide away doors hat give way to a wrap around balcony. This should then allow for the living areas to extend to the outdoor area. Having such an expansive living arrangement makes it as intimate or as social as the occupier wishes.

This crucial piece of infrastructure in this beach shack suburb will be finished with modern European finishes. Bamboo floorboards will be used for the flooring and morato marble will be used for the paneling and joinery. There will be a basement car park, finished in sandstone to accommodate all residents. The stylish architectural design and the rare beachfront location enables us as developers to offer the ultimate in beachfront living with the motto of 4 levels of elegance, and only 4 metres to the beach.

There will be a 10 metre by 3 metre pool on the beachside of the site to accommodate for a more personal environment for the residents of the building. The facility will come with a small BBQ area allowing for a full functioning facility. The pool will be lined with black pebbles to attract the sun so there will be no need for heating.

Quality expectations: Goals were set to ensure that the quality of the project in terms of product and process was not compromised. Project planning was done with the consideration of the external environment which included technological changes, customers and competitors, suppliers, geographical location and climate. economic political and social settings The project was planned to run for two years. The stages involved were

Show more
LEARN MORE EFFECTIVELY AND GET BETTER GRADES!
Ask a Question