One conveyor belt can move 1000 boxes in 10 minutes. Another can move 1000 boxes in 7 minutes. If another conveyor belt is added and all three are...
One conveyor belt can move 1000 boxes in 10 minutes. Another can move 1000 boxes in 7 minutes. If another conveyor belt is added and all three are used, the boxes are moved in 3 minutes. How long would it take the third conveyor belt alone to do the same job?