Answered You can buy a ready-made answer or pick a professional tutor to order an original one.

QUESTION

Planning the project Watt, A. (2019). Project Management, 2nd Edition. BCcampus Open Education. No Plagiarism and APA format needed. Problem set 1 Question 1 Everyone has been involved in projects

Planning the project

Watt, A. (2019). Project Management, 2nd Edition. BCcampus Open Education.

No Plagiarism and APA format needed. 

  • Project Management: Past and Present
  • Project Management Overview
  • The Project Life Cycle (Phases)

Write a  2 and half page about above topics with references 

No Plagiarism and APA format needed. 

Problem set  1

Question 1

Everyone has been involved in projects. What is the largest project you have been involved in? (You do not have to have been the project manager, but could have played another role.)

  1. Write one sentence that describes the objective of the project.
  2. Describe specifically how this project meets the definition of a project used in this textbook. (How is it unique? What were the time constraints? If it is over, how did you know it was over? If it is ongoing, how will you know when it is over?
  3. What was your role? Were you the project manager, a volunteer, some other role? If you were not the project manager, who was?
  4. Was the project part of a larger portfolio or program of projects?
  5. Who else was involved?
  6. What was the budget?
  7. Did you anticipate any risks at the outset? Did the project experience any outside forces that caused a change in either the objectives or the approach to achieving those objectives?

Question 2

In what ways can the following activities be seen as projects? In what ways do they resemble ongoing, routine business activities? Feel free to add assumptions and details to describe how the activity might be a project in one context and routine in another.

  1. Reading the chapter before attending a university lecture.
  2. Taking the bus to work each day.
  3. Piloting an aircraft between Vancouver and Fiji.
  4. Teaching a course for the first time; teaching the same course every semester.

Question 3

Go online and search for project life cycle models. Identify at least two that are different from the PMI model, and compare and contrast the phases. Be sure to cite your sources.

The assignment is to answer the questions provided above in essay form. This is to be in narrative form. Bullet points should not to be used. The paper should be at least 1.5 - 2 pages in length, Times New Roman 12-pt font, double-spaced, 1 inch margins and utilizing at least one outside scholarly or professional source related to organizational behavior. This does not mean blogs or websites. This source should be a published article in a scholarly journal. This source should provide substance and not just be mentioned briefly to fulfill this criteria. The textbook should also be utilized. Do not use quotes. Do not insert excess line spacing. APA formatting and citation should be used.

Problem set 2

Question 1.

1. Identify a major public infrastructure project that is either underway, complete, or proposed in your region. This could be a bridge, road, building, or something of that nature. For the project you have identified, think of as many stakeholders and stakeholder groups as you can. Create a three-column table. In column 1, list the stakeholders. In column 2, list what each stakeholder wants to get from the project. In column 3, list the influence each stakeholder has over the project.

Question 2. 

2. How can the stakeholders change over the course of a project? Give examples of changes in who the stakeholders are, and also in how their interests or influence over the project might change throughout the term of the project.

The assignment is to answer the questions provided above in essay form. This is to be in narrative form. Bullet points should not to be used. The paper should be at least 1.5 - 2 pages in length, Times New Roman 12-pt font, double-spaced, 1 inch margins and utilizing at least one outside scholarly or professional source related to organizational behavior. This does not mean blogs or websites. This source should be a published article in a scholarly journal. This source should provide substance and not just be mentioned briefly to fulfill this criteria. The textbook should also be utilized. Do not use quotes. Do not insert excess line spacing. APA formatting and citation should be used.

Show more
Anieno
Anieno
  • @
  • 41 orders completed
ANSWER

Tutor has posted answer for $10.00. See answer's preview

$10.00

* **** attached the ****** please ** ***** **

Click here to download attached files: project management.docx
Click here to download attached files: Problem set 1 and 2.docx
or Buy custom answer
LEARN MORE EFFECTIVELY AND GET BETTER GRADES!
Ask a Question