Answered You can buy a ready-made answer or pick a professional tutor to order an original one.
Portfolio Milestone Building on your work in Module 1 and 2 Portfolio Project Milestones and with a specific focus on your physical project at the company you selected, develop the following subsectio
Portfolio Milestone
Building on your work in Module 1 and 2 Portfolio Project Milestones and with a specific focus on your physical project at the company you selected, develop the following subsections of your project:
- Create WBS - including information on decomposition, and WBS to five levels as shown in the video example in Module 4.
- Activity list, attributes, and milestone list.
- Precedence diagramming method (PDM), dependency determination, task duration, and leads and lags, and critical path method (CPM).
- Project schedule network diagram with critical path, ES, LS, EF, LF, and slack.
Your well-written paper must meet the following requirements:
- 3-5 pages in length, not including cover, references page, and appendices. (With your prior work, this must bring you to 6 to 12 pages total.)
- Supporting documents must appear in appendices.
- The paper must be supported by at least 2 quality sources, of which 1 must be a current, scholarly resource. For this assignment, current, scholarly sources are peer-reviewed journal articles published within the most recent 3 years and accessed from the library databases or other academic sources. Textbooks will not count toward peer-reviewed requirements but may be used as quality sources if published within the most recent 3 years. The use of the PMBOK Guide as a quality source is strongly suggested. The PMBOK Guide is not a scholarly resource.
- Be sure to properly organize your writing and include an introduction, headings/subheadings for the body of your work, analysis and recommendations, conclusion, and list of references.
- @
- 1150 orders completed
- ANSWER
-
Tutor has posted answer for $75.00. See answer's preview
******