PQM201A Mod 5 - Situations calling for a cost estimate during a weapons systems procurement where there is lack of time for collection and analysis
PQM201A Mod 5 - Situations calling for a cost estimate during a weapons systems procurement where there is lack of time for collection and
analysis of historical data, or a lack the historical data itself, or if the design is incomplete, the most likely estimating
technique to use would be:
A. Handbooks and Indices since everything has already been listed for rapid retrieval
B. Engineering method since only engineers could provide a reliable estimate
C. Expert Opinion
D. No estimate should be provided since the design is incomplete