Answered You can buy a ready-made answer or pick a professional tutor to order an original one.

QUESTION

report title

TITLE PAGE

report title

your namesubmission date

EXECUTIVE SUMMARY

overview of subject mattermethods of analysisfindingsRecommendations

TABLE OF CONTENTS

list of numbered sections in report and their page numbers

INTRODUCTION

terms of referenceoutline of report’s structure

Aim

Purpose

BODY

Headings and Sub-Headings which reflect the contents of each section. Includes information on method of data collection (if applicable), the findings of the report and discussion of findings in light of theory

CONCLUSION

·     states the major inferences that can be drawn from the discussionmakes

·    Recommendations

REFERENCE LIST

list of reference material consulted during research for report

APPENDIX

information that supports your analysis but is not essential to its explanation

Formatting:

FONT SIZE, TYPE AND LINE SPACING

·         Use the font type, size and style consistently throughout the document.

· For text, use Times New Roman size 12, double line spacing throughout the document. Quotations from another reference should be in quotation marks and single‐spaced. Figure and table titles should also be single‐spaced.  

· For figure and table titles, use Times Roman size 10, single spacing.

· Chapter titles, section and subsection titles should use Times New Roman size 12, bold, single‐ spaced.

· Avoid using different types of font faces and do not change the font size.

· Avoid using combined features (bold, underline and italics).

MARGINS

Use margins of one inch on all sides of the page.  

NUMBERS

· Any number below 1 is singular, and any number larger than 1 is plural. Hence, something is 0.5 inch, not 0.5 inches. Something else may measure 1.1 liters (plural), not 1.1 liter (singular).  

FIGURES

Figure numbers and figure titles should appear below the figures.  

TABLES

Table number and title should appear above the figure.  

Show more
  • @
  • 165 orders completed
ANSWER

Tutor has posted answer for $17.00. See answer's preview

$17.00

********** ******************************************* Park Children ****** ****** ** * ******* ******* ** ****** children *** *********** to have *** *** **** ***** We ***** ** **** ******** ** ******** *** put **** ******* challenging ***** **** ** **** ****** and ******* We ******* **** gives *** ******** an opportunity ** ******* their creativity *** ** *** **** run ***** them **** ** ****** ********* ******* ********** **** **** cases ** ********* ******* *** ***** we put **** ******* ***** ***** ********** *** *** **** at ***** they **** ********* *** ****** ******* *** children **** *** *** ** **** ** ****** ***** ************* ****** of service *** * **** *** given **** a *** of ******** **** interested ** ****** **** ** *** sports * lot ** ******* **** ***** ** have ***** children **** **** in *** ******** activities ***** that it boosted their ****** *** **** *** ** ******** more The **** ****** could **** ** **** ***** on *** ***** of ****** since at **** point ** *** ** ******* *** ****** ** ******** ******* **** *** park ******* ** ************** **** was ** ********* **** the ******** ********** *** adults went to ***** quarter ** *** **** ** could *** an ************* ** ** ********* *** ****** **** ***** to *** *** children **** left out **** *** ** *********** **** *** *** tapped ****** ********* we went for ** *** ******* ****** we *** ** ****** **** **** *** **** ****** relation *** ********* ************* ** *** ****** ******* We included ******** and *** ******** *** *********** *** ******** ** ***** to *** ******** being **** ******** *** ******* attracted ** the piñatas *** *** ******** ** **** *** to get *** ******** ** a good ********* ********* who came ** **** ***** ** **** ** **** ****** *** *** children ** ********* locations within *** stateThe difficulties we *** to ******** included *** ********** ** entering *** ******** *** ******* * ****** ****** in *** ***** few ***** In addition ** ** *** ** spend * *** ** ***** *********** * ****** service ** ******* ******* ** *** *** ******** **** ********* *** ****** ********** ** was initially ******* This **** *** **** *** budget ** had ******* *** the ***** ******** ** intended ** ********* *** summer holidays ** **** * *** ***** ***** our **** was always **** *** we made **** ******* **** **** This ******* **** ** much easier *** ** ** make a *** *** ******* ************* of up to ****** **** **** ** *** ***** of JulyBusiness ************ ******* *** * ***** ** *** staff members ***** ** ************** and ***** ** ********** ********** *** members ******* ******** the ********* executive * as *** ******** **** ******* and ************** ******* Ray ********* ********* ***** ******** designer ***** *** events ********* *** *** ****** Patrick ********* ********* Raymond ******** *** ****** the ********** ************************ chart              FinanceThe business *** financed ******* ****** ****** through ***** sourcing ***** ******* ** raise ****** We ****** *** **** ** *** ***** from *** savings thus enabling ** *** ***** *** ******* up and marketing *** ******** ** *** publici **** **** forecast We ****** * ****** ******** in ****** ** ******* ********* ***** *** ******** ******* the ****** ** *** ********* generated by our ******* ******** ** reducing the ****** ** *** **** also lead to ** ******** ** *** ****** of ******* **** *** ***** ********* **** companies throughout *** year This ** a ***** ** ****** ** continue Based ** *** ********** ***** we *** ****** ** **** ***** packages as **** next year ** an average ***** ** $1600 ***** deductions we **** be expecting * ***** profit ** $17200 over *** ***** year Q1Q2Q3Q4 Year Total Enquiriesgenerated ******* ********* *** * *** *************************************************** **************************************** Sold ****************************************************************************** received  3340 484 720331  ************************** on ********* ***** other ******** ************************************** ********** ***** **** ***************************************************** ****** *** first ***** quarters  Q1$  Q2$Q3$ ***************** **** cost of ******************** ****** 1106166656242 **** ******** **************** ****** ****** ***** ************************ for ***** ****************** ****** ***** taxes 9071870012390979  ConclusionWith ********** *** ********** ********* our ******* **** ** at *** *** *** market ** *** most sought ***** ******* for the youths in the ***** *************** ** also another ******** **** *** ******* us *** out *** ******** ** the industry ** *** ****** ***** that we ***** unique ******** ******** ** the rest of *** companies **** *** merely copycats ** their **** ** ******** ** *** easy *** ** ** ********* *** ****** ******* ** ********** *** **** ** children *** what they ********** ** ***** *** ** ****

Click here to download attached files: Business Report...docx
or Buy custom answer
LEARN MORE EFFECTIVELY AND GET BETTER GRADES!
Ask a Question