Answered You can buy a ready-made answer or pick a professional tutor to order an original one.

QUESTION

Topic: Occupational safety and health standards Unit VI Case StudyPages: 2Sources: 1Format: APADeadline: 12 hoursInstructions:The standards in Subpart S are consistently in the top 10 in OSHA’s most

Topic: Occupational safety and health standards Unit VI Case Study

Pages: 2

Sources: 1

Format: APA

Deadline: 12 hours

Instructions:

The standards in Subpart S are consistently in the top 10 in OSHA’s most frequently cited standards lists and highest penalties assessed lists. The standards in Subpart S are complex and often misunderstood—even by professional electricians.

Use the checklist here to conduct an electrical safety inspection of your workplace. Add the citation for the OSHA standard for each question. In the comments section for each item, include your recommendations for correcting the violations. If a checklist item does not apply to your organization, explain why in the comments. In the summary section at the end of the checklist, discuss the significance of any noncompliance you found, and identify the types of injuries that might result if the violations are left uncorrected.

If you did not find any noncompliance, discuss what your organization does to prevent electrical safety violations and electrical injuries. Compile the checklist information into a report that outlines the major issues, if any, found in your workplace.

The case study should be a minimum of two pages in length (double-spaced), including the completed checklist. The report must follow APA guidelines for formatting, and the report must include a title page and reference page.

Show more
  • @
  • 966 orders completed
ANSWER

Tutor has posted answer for $15.00. See answer's preview

$15.00

************ ********** SUBPART-SName:Course:Tutor:Date:ELECTRICAL ****************** ******* ****** *** *********** ****** Part **** ********** Cabinets ********* Boxes *** ************** *** the ***** ** the ******** *** *** conductors? **** **** been protected **** *** **** of ********* *** *** ***************** ** *** *** ***** *** opening **** the ********** go through **** they **** ******* ******* *** CFR ***************** ** ****** ***** *** ******** **** *** ** *** ******** ***** **** *** been **** ******** *** 1910305(b)(1)]Yes ** N/aWithin ***** ******** ***** are ***** *** ******** ****** provided ** the ********** ** *** ***** *** *** ***************** ** N/aCould there be *** ***** ***** that *** *** **** ******** *** CFR 1910305(b)(2)]Yes ** ******* ********** **** *** single-throw knife ******** ****** ********* ** * *** **** **** will ** ******** **** left ***** [29 *** 1910305(c)(1)]Important ****** **** ******** **** ** handled ** ********* ******* ******* ** **** Have *** ******** **** kept ** a position **** shall *** allow ************* **** that could likely ***** **** ***** *** CFR ***************** No N/aPart **** Enclosures *** the Damp ********** **** ** *** ***** ** *** ********* **** **** **** kept ** * way **** ***** ** protected **** coming into contact with ********* *** *** ***************** No N/a 9 **** is *** ***** ** the areas where the ******* breakers **** **** ********** *** they **** from any *** ********* *** *** ***************** ** N/aPart **** ********** *** Overall ****** ******** ** *** ***** *** conductors **** in wiring that not ********* or let exposed? [29 *** ************** No *** ** **** ** *** ***** ** ********** ***** *** it **** ******** ** be **** ** *** ***** ************ ** ******** *** CFR 1910305(f)]Yes ** N/a12 *** *** ********** ****** **** *** ***** ******* Are these ****** distinguishable from **** ****** *** *** ************** No ******* **** Flexible ***** *** the ****** ** ***** Have *** flexible cords **** **** been ********** adhered *** For ******* ***** **** *** running ******* ***** ** ******* ***** *** ********* *** *** ********************** No ******* ** the cords **** ** * ********** ******* any being ****** ** sliced?[29 *** ********************* No ******* Have *** flexible cords ***** ** connected **** fittings that ***** ****** that **** *** *** ****** down?[29 *** 1910305(g)(2)(iii)]Yes ** N/a Summary SectionThe analysis of ********** ****** ** **** ************ *** *** **** *** ***** electrical ****** ****** *** ************ **** ********* ********** ****** ******** that ***** ***** *** of *** employees *** ********** ********* *** ********** ** the ************ ******* *** ***** ***** ******** the ************ **** ******* **** all *** ********** equipment that are ******** **** ********* This ensures that *** electrical ********* ***** the required ********* *** ** **** ******** 2016) *********** *** process ** electrical ************ *** supervision ******* ***** ********** *** ***** These ********** ****** that *** ************ is ******* *** ******** ********** safety ********* ** is ********* *** all ******** to ensure **** *** ****** ********** ** *** ************ *** **** *** ******* ***** *** ***** ********** equipment *** ******** to **** ********** ** ********** safetyReferencesOccupational Safety *** ****** ************** ** CFR ******************** D * (2016) ********** ****** ************* 29 CFR 1910269 and **** ******** ************* Transactions ** ******** Applications52(4) 2753-2758Pruitt I ***** ***** * ****** *********** **** *** ********* *** electrical ****** *********** *** Chemical ******** ********* ********** (PCIC) **** ******* 1-4) ****

Click here to download attached files: Electrical Checklists Subpart S.docx
or Buy custom answer
LEARN MORE EFFECTIVELY AND GET BETTER GRADES!
Ask a Question