Which metric does a project manager have most control over:

Which metric does a project manager have most control over: cost variance, schedule variance, cost performance index, and schedule performance index

Answer 1:The project management metric enables the project manager to access the status of the ongoingproject in terms of profitability, costs and schedule. Using this metric, he can keep a check...